Upgrading from R6 to R9.1
James LeLeux <[email protected]>
| Newsgroups | gmane.comp.systems.as400.mapics |
|---|---|
| Message-ID | <CANXhosLT_6iYh4fG3C-j66fh6rPiDC9CYSozPtTZ3pEyOvJnAQ@mail.gmail.com> |
Hello, We are prepping for an upgrade from R6 to R9.1, I have a production box that is V5R1 and a test box that is V7R1. I can load a copy of my V5R1 R6 production XA environment on my new V7R1 box, but some program objects fail to come over due to date references. I cannot run ANZOBJ or ANZOBJCNV because they do not exist on my V5R1 box, and I cannot upgrade current box as it has no OS support. However the data comes over fine (cursory check, RSTLIB reported no errors with AMFLIB*, unlike AMALIB*). I'm wondering if I need to worry about this since the R9 migration tool migrates the data, perhaps an incomplete AMALIB is ok? I am awaiting the media from Infor, but thought I'd ask if anyone else has gone this route. Appreciate any tips you may have. Thanks! _______________________________________________ This is the MAPICS ERP System Discussion (MAPICS-L) mailing list To post a message email: MAPICS-L-Zwy7GipZuJhWk0Htik3J/[email protected] To subscribe, unsubscribe, or change list options, visit: http://lists.midrange.com/mailman/listinfo/mapics-l or email: MAPICS-L-request-Zwy7GipZuJhWk0Htik3J/[email protected] Before posting, please take a moment to review the archives at http://archive.midrange.com/mapics-l.