Upgrading from R6 to R9.1

James LeLeux <[email protected]>
Newsgroups gmane.comp.systems.as400.mapics
Message-ID <CANXhosLT_6iYh4fG3C-j66fh6rPiDC9CYSozPtTZ3pEyOvJnAQ@mail.gmail.com>
Hello,

We are prepping for an upgrade from R6 to R9.1, I have a production box
that is V5R1 and a test box that is V7R1.

I can load a copy of my V5R1 R6 production XA environment on my new V7R1
box, but some program objects fail to come over due to date references.
I cannot run ANZOBJ or ANZOBJCNV because they do not exist on my V5R1 box,
and I cannot upgrade current box as it has no OS support.
However the data comes over fine (cursory check, RSTLIB reported no errors
with AMFLIB*, unlike AMALIB*).

I'm wondering if I need to worry about this since the R9 migration tool
migrates the data, perhaps an incomplete AMALIB is ok?

I am awaiting the media from Infor, but thought I'd ask if anyone else has
gone this route.

Appreciate any tips you may have.

Thanks!
_______________________________________________
This is the MAPICS ERP System Discussion (MAPICS-L) mailing list
To post a message email: MAPICS-L-Zwy7GipZuJhWk0Htik3J/[email protected]
To subscribe, unsubscribe, or change list options,
visit: http://lists.midrange.com/mailman/listinfo/mapics-l
or email: MAPICS-L-request-Zwy7GipZuJhWk0Htik3J/[email protected]
Before posting, please take a moment to review the archives
at http://archive.midrange.com/mapics-l.
lmpx.com only provides a reader for public news (NNTP) servers. It is not affiliated with the servers or forums shown here and is not responsible for the content of articles, which is written by their respective authors.