Re: Performance Issues in R9
"Rad Yates" <[email protected]>
| Newsgroups | gmane.comp.systems.as400.mapics |
|---|---|
| Message-ID | <E6AA4597EEB24D1F9D6B858A2149D3DB@XPS400> |
We are getting ready to move to R9.0 from R7.7 in July 2012. All of our testing demonstrates that memory may be the key component to consider when upgrading. We have taken a multi-faceted approach to increasing the performance of Power Link: 1. In November 2012 we replaced a Power 6 box with a Power 7 box, for fewer lease dollars, using an IBM program that packaged Sequel with the hardware: a. 50% more processor b. 80% more disk c. 300% more memory d. 17% solid state disk 2. We will upgrade the operating system from 6.1 to 7.1 in November 2012 3. Power Link 9.0 definitely performs faster than 7.7 PL with the right resources 4. Java 1.6 is definitely faster than 1.4 5. We are implementing a Citrix farm for remote PL users as well Rad Yates Director of I/T and Infor Migration Project Leader MTD Products Inc. _______________________________________________ This is the MAPICS ERP System Discussion (MAPICS-L) mailing list To post a message email: MAPICS-L-Zwy7GipZuJhWk0Htik3J/[email protected] To subscribe, unsubscribe, or change list options, visit: http://lists.midrange.com/mailman/listinfo/mapics-l or email: MAPICS-L-request-Zwy7GipZuJhWk0Htik3J/[email protected] Before posting, please take a moment to review the archives at http://archive.midrange.com/mapics-l.