Re: Automation of RM's

Alan Kreutzer <alan.kreutzer-my/[email protected]>
Newsgroups gmane.comp.systems.as400.mapics
Message-ID <[email protected]>

> 
> Alan,
> We have implemented a mix of creating our own labels at the end of the 
> production line. After the part has passed the testing then the PLC passes 
> this to us, create label. record RX transaction or RM as needed, run any 
> special part or supplier based activity, then finish with reporting. Takes 
> a while to develop and verify, so patience is the key.
> 
> From:   Alan Kreutzer <alan.kreutzer@...>
> To:     mapics-l@..., 
> Date:   08/08/2012 09:13 AM
> Subject:        [MAPICS-L] Automation of RM's
> Sent by:        mapics-l-bounces@...
> 
> Someone has to of already solved this problem. We are on version XA 7.7, 
> green 
> screen and PowerLink.
> 
> We are manually keying all of our RM's at the end of the day after our 
> packing 
> department shift is complete. As things are complete we have a person 
> writing 
> down the items, and accumulating the paperwork during the day. After the 
> shift 
> is complete, all of the paperwork is accumulated and given to a person to 
> manually enter the RM's.
> 
> How has anyone else created a more effecient process, to get the RM's 
> entered 
> in more real-time so that we don't have shipping inventory issues.
> 
> Any help would be greatly appreciated.
> 
> thanks,
> 
> Alan Kreutzer
> IT Manager
> Office:  719-598-5070, ext. 2456
> Cell: 719-466-0424
> alan.kreutzer@...
> 
> _______________________________________________
> This is the MAPICS ERP System Discussion (MAPICS-L) mailing list
> To post a message email: MAPICS-L@...
> To subscribe, unsubscribe, or change list options,
> visit: http://lists.midrange.com/mailman/listinfo/mapics-l
> or email: MAPICS-L-request@...
> Before posting, please take a moment to review the archives
> at http://archive.midrange.com/mapics-l.
> 
> == This message has been scanned for viruses ==
> 
> 
> _______________________________________________
> This is the MAPICS ERP System Discussion (MAPICS-L) mailing list
> To post a message email: MAPICS-L@...
> To subscribe, unsubscribe, or change list options,
> visit: http://lists.midrange.com/mailman/listinfo/mapics-l
> or email: MAPICS-L-request@...
> Before posting, please take a moment to review the archives
> at http://archive.midrange.com/mapics-l.
> 
> 
More detail on what I exacly need to do:

I need to automatically create the "MO", then the "RM" to put the finished 
good into inventory. Western Forge is using a very strange process, we don't 
really use MO's to control our manufacturing process. So the manual process 
that's happening now is that we have someone manually keying an "MO" so that 
they can "RM" against it. I want to remove the manual keying of both, we are 
using the CISTECH PPS product and it will create the "RM" for me from the gun. 
But I still have a problem as I don't have an open "MO" to go against....any 
suggestions?

This is only a short-term fix as we are looking at our entire process to 
figure out the right solution.

Thanks again for everyone who responded....we just aren't doing 
things "normally" so I need to be creative.

Alan Kreutzer
IT Manager
Office:  719-598-5070, ext. 2456
Cell: 719-466-0424
alan.kreutzer-my/[email protected]



_______________________________________________
This is the MAPICS ERP System Discussion (MAPICS-L) mailing list
To post a message email: MAPICS-L-Zwy7GipZuJhWk0Htik3J/[email protected]
To subscribe, unsubscribe, or change list options,
visit: http://lists.midrange.com/mailman/listinfo/mapics-l
or email: MAPICS-L-request-Zwy7GipZuJhWk0Htik3J/[email protected]
Before posting, please take a moment to review the archives
at http://archive.midrange.com/mapics-l.
lmpx.com only provides a reader for public news (NNTP) servers. It is not affiliated with the servers or forums shown here and is not responsible for the content of articles, which is written by their respective authors.