Re: Feature/option planning factor
Kevin Fox <[email protected]>
| Newsgroups | gmane.comp.systems.as400.mapics |
|---|---|
| Message-ID | <CALo5ePem1Ut4SNDCs7y_4WrxwT-jZRdyEmrzVHLjGJ4cp+N-ow@mail.gmail.com> |
Easiest solution is to use planning bills of material. On Fri, Feb 15, 2013 at 9:28 AM, Steve Smith <[email protected]>wrote: > Is there something equivalent to the feature/option planining factor in > kbc or Buy Design? > > Using KBC or Buy Design, how do you plan through Forecasting/MRP the > quantity of each option that you might need when one option is selected 70 > percent of the time and the other option is selected 30 percent of the > time? > > If you are using features/options for your configurator then you can use > the features/option panning factor. How do you handle this with kbc or buy > design? > > Thanks for any assistance. > -- > This is the MAPICS ERP System Discussion (MAPICS-L) mailing list > To post a message email: MAPICS-L-Zwy7GipZuJhWk0Htik3J/[email protected] > To subscribe, unsubscribe, or change list options, > visit: http://lists.midrange.com/mailman/listinfo/mapics-l > or email: MAPICS-L-request-Zwy7GipZuJhWk0Htik3J/[email protected] > Before posting, please take a moment to review the archives > at http://archive.midrange.com/mapics-l. > > -- This is the MAPICS ERP System Discussion (MAPICS-L) mailing list To post a message email: MAPICS-L-Zwy7GipZuJhWk0Htik3J/[email protected] To subscribe, unsubscribe, or change list options, visit: http://lists.midrange.com/mailman/listinfo/mapics-l or email: MAPICS-L-request-Zwy7GipZuJhWk0Htik3J/[email protected] Before posting, please take a moment to review the archives at http://archive.midrange.com/mapics-l.