Re: IM - Transaction question
Kevin Fox <[email protected]>
| Newsgroups | gmane.comp.systems.as400.mapics |
|---|---|
| Message-ID | <CALo5ePfS4oQxDuk_SpjZinhAL=h0J3TvcojJWmoWJR-H+khC-w@mail.gmail.com> |
I would assume that this inspection process could result in 'rejects' and rework. I'd recommend adding a last operation of inspection. This is the easiest solution, and if you have rejects that need to be disposition, you can split the order. (Just remember that the split order goes forward with the completed parts and the original order stays with the rejects!) In addition, or alternatly you can turn the Inspection Required flag on the Item Master / Item Revision to Yes (IOR = Y). When you do the RM, the parts are placed into a QC#### location. You will then need to process and MQ (manufacturing order Quality) transaction to receive them into approved stock. I recommend the additional operation. it keeps scheduling more accurate as well. On Fri, Oct 17, 2014 at 10:39 AM, j w <[email protected]> wrote: > Hi board, I was hoping you could help me. > > My company has issued an immediate RM as soon as production has finished. > However now we have the need (because of extra testing) to add another step > to the process for testing after the product has been produced but before > the finished product is available for sell. I would like to continue > updating the inventory as soon as we finish production but what method or > transaction code can I put the finished product into the computer without > using an RM, My thought is a work in process transaction code and then move > it to RM or something. Another idea was temp. warehouse and then do a > warehouse move to the real warehouse (i didnt like this idea). > > I hope this makes sense. Thanks > > Jeff Williams > -- > This is the MAPICS ERP System Discussion (MAPICS-L) mailing list > To post a message email: MAPICS-L-Zwy7GipZuJhWk0Htik3J/[email protected] > To subscribe, unsubscribe, or change list options, > visit: http://lists.midrange.com/mailman/listinfo/mapics-l > or email: MAPICS-L-request-Zwy7GipZuJhWk0Htik3J/[email protected] > Before posting, please take a moment to review the archives > at http://archive.midrange.com/mapics-l. > > -- This is the MAPICS ERP System Discussion (MAPICS-L) mailing list To post a message email: MAPICS-L-Zwy7GipZuJhWk0Htik3J/[email protected] To subscribe, unsubscribe, or change list options, visit: http://lists.midrange.com/mailman/listinfo/mapics-l or email: MAPICS-L-request-Zwy7GipZuJhWk0Htik3J/[email protected] Before posting, please take a moment to review the archives at http://archive.midrange.com/mapics-l.