ATP

"Morrison, Doug" <[email protected]>
Newsgroups gmane.comp.systems.as400.mapics
Message-ID <DM2PR0301MB0608CD652077FA03F7B8C2CBDA760@DM2PR0301MB0608.namprd03.prod.outlook.com>
Using PowerLink Order Entry is there a way to tell if ATP was able to calculate the MDD or not.

In the line item user exit programs USPCD*** I need to be able to determine if ATP calculated the date or it defaulted it to the current date because ATP couldn't calculate a date.

Thanks in advance for your input.



-- 
This is the MAPICS ERP System Discussion (MAPICS-L) mailing list
To post a message email: MAPICS-L-Zwy7GipZuJhWk0Htik3J/[email protected]
To subscribe, unsubscribe, or change list options,
visit: http://lists.midrange.com/mailman/listinfo/mapics-l
or email: MAPICS-L-request-Zwy7GipZuJhWk0Htik3J/[email protected]
Before posting, please take a moment to review the archives
at http://archive.midrange.com/mapics-l.
lmpx.com only provides a reader for public news (NNTP) servers. It is not affiliated with the servers or forums shown here and is not responsible for the content of articles, which is written by their respective authors.