XA Refreshes

Scott Johnson <[email protected]>
Newsgroups gmane.comp.systems.as400.mapics
Message-ID <BN1PR0201MB0817A80EC398E468A3663931F3CD0@BN1PR0201MB0817.namprd02.prod.outlook.com>
I did some searching in the archives on the subject of refreshing a Test XA Environment from a Production XA Environment. I found some entries from 2012.  Most said to do a save/restore. One or two said to use the Update Environment feature.

We recently upgraded to release 9.1.2.  I am wondering if release 9 brings anything new to the table.  I have scratched the surface on what is new in the release and one of the things I came across is it looks like there is some sort of replication in SystemLink.


1.       Does release 9 provide anything new in the world of refreshing?


2.       Are there any different options when the From and To Environments are on the same LPAR?


3.       Anything new on this subject since 2012?



Thanks,
  Scott Johnson

-- 
This is the MAPICS ERP System Discussion (MAPICS-L) mailing list
To post a message email: MAPICS-L-Zwy7GipZuJhWk0Htik3J/[email protected]
To subscribe, unsubscribe, or change list options,
visit: http://lists.midrange.com/mailman/listinfo/mapics-l
or email: MAPICS-L-request-Zwy7GipZuJhWk0Htik3J/[email protected]
Before posting, please take a moment to review the archives
at http://archive.midrange.com/mapics-l.
lmpx.com only provides a reader for public news (NNTP) servers. It is not affiliated with the servers or forums shown here and is not responsible for the content of articles, which is written by their respective authors.