Re: Extended maintenance for Phabricator
Danny McGrath via Bf-committers <[email protected]> Fri, 11 Mar 2022 16:02:50 -0500
| Newsgroups | gmane.comp.video.blender.devel |
|---|---|
| Message-ID | <CAK82gMGGomQ1m=BpFAZQb+W6ex_8UJGV89iHJ=2n-X=bSQiiSg@mail.gmail.com> |
Hi, The phabricator specific table work should be done now. There might be some slow spots due to caches and other system I/O, but otherwise, things should be fine. On Fri, Mar 11, 2022 at 10:01 AM Danny McGrath <[email protected]> wrote: > Hi, > > I will be performing some extended MySQL maintenance tonight on the > Phabricator database at developer.blender.org. > > While most of the DB tables have already been optimized, one of the > extremely large ones, has yet to be done. This particular optimization will > require multiple hours, mostly due to excessive HDD load on this particular > server. Estimates place the task to be in the 2 to 4 hour range, based on > past tables. > > I will aim to start the work around 2pm EST/8pm CET today. If the site > runes without length blocking or slowdown, I may opt to leave it > functioning. However, if it becomes a problem, I may place the site into > maintenance mode with a banner page. > > I will report back here to this mail when everything is complete. Sorry > for the inconvenience! > > -- > Cheers, > Danny > > ------------------------------------------------- > Danny McGrath - [email protected] - www.blender.org > System Administrator at Blender > GPG key: 0x696871CA > -- Cheers, Danny ------------------------------------------------- Danny McGrath - [email protected] - www.blender.org System Administrator at Blender GPG key: 0x696871CA _______________________________________________ Bf-committers mailing list [email protected] List details, subscription details or unsubscribe: https://lists.blender.org/mailman/listinfo/bf-committers