Re: A/V sync issues in cluster mode
Nicola Di Nisio <[email protected]> Mon, 13 Apr 2009 21:18:39 +0200
| Newsgroups | gmane.comp.video.dvdrip.user |
|---|---|
| Message-ID | <[email protected]> |
Kind Regards Nicola Di Nisio +49 6151 8600535 On Apr 13, 2009, at 20:38, Jim Robert <[email protected]> wrote: > in my experience it is better to have a single NFS that all the > nodes use, and have a single server start up 'stand alone' ripping > projects on each node via command line, with all the projects (and > their results) located on the NFS. > > Just make sure you have a VERY fast lan set up ;) > This is exactly what I attempted, the only difference in my case was that I used a network drive mounted with CIFS on all nodes. One node was connected with wire (100 Mb/s), the others wireless (54 Mb/s). I doubt that bandwidth was the issue, because all CPUs were all always full loaded.