Re: Re: Re: Fatal error in calendar
Greg Valcourt <[email protected]> Wed, 5 May 2010 17:05:58 -0700 (MST)
| Newsgroups | gmane.comp.web.phpgroupware.general |
|---|---|
| Organization | phpGroupware Forums |
| Message-ID | <[email protected]> |
Is there a solution to this problem? I've got the same problem with my se= rver. Sever Specs: Ubuntu Hardy Linux 2.6.24-16-server #1 SMP Thu Apr 10 13:58:00 UTC 2008 i686 Server version: Apache/2.2.8 (Ubuntu) Server built: Nov 13 2009 21:59:05 PHP 5.2.4 PHPGroupware 0.9.16.015 The database runs on a different server: Ubuntu Hardy Linux 2.6.24-16-server #1 SMP Thu Apr 10 13:58:00 UTC 2008 i686 PostgreSQL 8.3 I haven't been able to personally duplicate the issue. I got E-mails from= two users today, after upgrading from 0.9.16.12 last night. They say it = happens when ignoring conflicts after changing the date of an existing Ca= lendar entry.Sent from the phpGroupWare forums @ http://forums.phpGroupWa= re.org