Re: Trouble with cyclic diary and planner-appt-forthcoming

Jim Ottaway <[email protected]>
Newsgroups gmane.emacs.wiki.general
Message-ID <[email protected]>
>>>>> Seth Falcon <[email protected]> writes:

> Jim Ottaway <[email protected]> writes:
>>> Why are some things showing up past 7 days?  Any ideas?
>> 
>> Yes, I see that, at least for appt tasks [i.e., not cyclical tasks].
>> There must be an off-by-one error in either the code to get
>> forthcoming cyclic appts or the code that gets task appts, so the
>> behaviour of the one differs from that of the other.
>> 
>> What about the task entered in the diary, though? was that a cyclical
>> task? 

> One appointment was defined in my cyclic diary file (and that is the
> only diary-like file that I am using AFAIK) as a diary-block.  The
> other was a scheduled task.

> It is possible that I visited that day page and caused the task to be
> written from the diary to the day page.  IOW, it could still be
> consistent with a difference of opinion in how cyclic appts (via diary
> file) and those that start life as a task are processed.

Yes, that is entirely possible.  I will look into the difference of
opinion and try to have the two functions reach a consensus. It looks
easy enough to fix.


-- 
Jim Ottaway
lmpx.com only provides a reader for public news (NNTP) servers. It is not affiliated with the servers or forums shown here and is not responsible for the content of articles, which is written by their respective authors.