Re: planner-report
[email protected] (Andrew J. Korty)
| Newsgroups | gmane.emacs.wiki.general |
|---|---|
| Message-ID | <[email protected]> |
-----BEGIN PGP SIGNED MESSAGE----- Hash: SHA1 Torsten Anders <[email protected]> writes: > it appears planner-report changes my tasks in an (for me at least) > unwanted way. On the day page(s) it replaced the links to the project > page to a link to the report it generates. Besides, all my timing tags > vanished. The latter was particularly surprising for me, as these time > tags are just the beginning of a task description. > > Is this intended behaviour? No, those are bugs. I've never run into them, but I'll take a look. > BTW: I used planner-multi. That may be causing the problem with relinking the tasks on the project pages. I've run into some conceptual problems getting planner-multi and planner-report to work together. If a note has multiple tags, should it appear more than once in the status report? If not, under what heading should it appear? But I've found that for my purposes, planner-multi renders planner-report obsolete. I wrote planner-report so I could give my boss a biweekly status report. But with planner-multi, I can just tag each task or note with "status" if I want it to appear there. I have some code (not very mature yet) to archive the status page every two weeks, moving all the tasks and notes to a dated page of the form status-YYYY.MM.DD. - -- Andrew J. Korty, Chief Security Engineer, GCIA, GCFA Office of the Vice President for Information Technology Indiana University -----BEGIN PGP SIGNATURE----- Version: GnuPG v1.4.2.2 (GNU/Linux) iD8DBQFENlOM8gM8+Mr5peERAhhUAKDMrxINVuuhlOFLOAVgTB65cUaBIACgjudo MtQzVa3z83/ZNhPC6hyMGjU= =6Qn6 -----END PGP SIGNATURE-----