Milestone Update for the Working Group Documents
"Menachem Dodge" <[email protected]> Fri, 17 Aug 2007 15:59:19 +0300
| Newsgroups | gmane.ietf.adslmib |
|---|---|
| Message-ID | <[email protected]> |
Hello,
As the on-going work on our current drafts is a little behind
schedule, I propose the following update to the schedule of work:
Vdsl2 Document
=============
August 2007: Post draft version 03 .
September 2007: Post draft version 04.
*October 2007: Complete Thorough Working Group Reviews of the Vdsl2
draft and produce version 05.
December 2007: Working Group Last Call.
January 2008: Request an early MIB Doctor Reviews of the working
group draft.
*February 2008: Make Correction to the draft following the review.
March 2008: Working Group Last Call following corrections.
April 2008: Present the document to the IESG.
G.Bond Documents
===============
August 2007: Post the version 1 draft of all the four G.Bond
documents
October 2007: Complete the work on all the four documents.
* November 2007: Working Group Last Call on all the documents.
* December 2007: Request an early MIB Doctor Review of all
documents.
* January 2008: Make Corrections to the drafts following the
review.
* February 2008: Working Group Last Call following corrections.
March 2008: Present the document to the IESG.
Please send any comments to this schedule by the 24th August.
Best Regards,
Menachem