RE: option 5 for TIFF-FX
Hiroshi Tamura <[email protected]>
| Newsgroups | gmane.ietf.fax |
|---|---|
| Message-ID | <[email protected]> |
> Option 5 Proposed Plan > > Draft DELIVERABLES > The following three specifications should be delivered to address the MIME > sub-type issue: > 1) draft-ietf-fax-tiff-regbis-03 > revisions to existing draft draft-ietf-fax-tiff-regbis-02 > 2) draft-ietf-fax-tiffx-reg-00 > a new draft > 3) draft-ietf-fax-tiff-fx-10 > revisions to existing draft draft-ietf-fax-tiff-fx-09 OK. We need them. > Rational for these deliverables are driven by the current image/tiff MIME > sub-type definition, see appendix below, and the recent WG consensus to > a) retain the current single TIFF-FX specification, > b) limit the image/tiff MIME sub-type definition and .tif (.tiff) file > extension to TIFF 6.0 and the TIFF-FX profiles that are renderable by the > current viewer base (Profiles S and F), We have two choices (Two separate ones or one document for registration). You selected two documents. Please take care of which is better. Editors should consider it well. > c) define a new MIME sub-type and file extension (e.g. image/tiffx and .tfx > respectively) to refer to other TIFF-FX profiles. Yes. Of course image/tiff for Profiles S and F must be included. > TIMELINES > The progression timeline is as follows: > - The three drafts should be available for WG review prior to November. Now is almost the end of October. Anyway, we should have them prior to December meeting. > - Given the limited MIME sub-type scope, it may be possible to have > incremental versions of these drafts issued as appropriate in time for the > December IETF meeting. > - A rough consensus check of the drafts should be targeted for the December > WG meeting. > - A test plan draft for draft-ietf-fax-tiffx-reg-xx interoperability testing > and verification of that current viewers can successfully read Profile S & F > should be available for the WG meeting. > - End of January 2002 is the target for completion of the test plan and > sign-up of participants. > - End of February 2002 may then be a reasonable target for completion of > draft-ietf-fax-tiffx-reg-xx interoperability testing, along with Profile S & > F viewing confirmation. > - WG Last Call of the three drafts should be targeted for the March IETF > meeting. > - If all is smooth, it may be reasonable that Draft Standard or at least > Proposed Standard would be issued early during 2Q02, dependent on IESG > responsiveness. This is the important point. OK. Basically, I agree. > DELIVERABLES DESCRIPTION W.R.T. description, after the new I-Ds are available, I comment if it is necessary. It depends on the detailed contents. I know your suggestion is well-written. Anyway, please proceed. Also, if anyone have comments, please do. -- Hiroshi Tamura, Ricoh Company, LTD. E-mail: [email protected]