RE: Internet FAX WG meeting summary
"McIntyre, Lloyd" <[email protected]>
| Newsgroups | gmane.ietf.fax |
|---|---|
| Message-ID | <[email protected]> |
Claudio, Thanks for a job well done in conducting what could have been a difficult meeting and preparing such thorough minutes within a short period. I have provided a few clarification proposals below. Lloyd > 2. Status of Draft Standard consideration > 2.1 TIFF-FX > - draft-ietf-fax-tiff-fx-11.txt > - draft-ietf-fax-tiff-regbis-03.txt > - draft-ietf-fax-tiff-fx-reg-01.txt > Single TIFF-FX specification with 2 Content-type > --snip-- > > Mid Semptember 2002 > > - to have image/tiff-fx registration and tiff-fx file format > specification piublished as Draft Standards This should indicate approved rather than published as Draft Standards. It is likely that publication will occur later than September. > --snip-- > Then the Draft Progression Path Concurrence is again revised: > > - image/tiff revised registration goes from I-D to BCP > > - image/tiff-fx goes from I-D to Proposed Standard, waits 6 > months, and > is updated as I-D which goes then for Proposed Standard This should read "then for Draft Standard" rather than Proposed Standard. > > 8 Confirmation of milestones > - FFPIM > > Final draft due for X-mas 2001 > > - ESMTP-CONNEG > > Nov 2001 final draft submitted (Done) > > Jan 2002 IETF last call > > - TIFF-FX extension > > on hold until TIFF-FX new documents are finalized. Maybe Jun 2002. To be consistent with section 6.4 please consider changing this to read "on hold until relevant new documents are at a stable state. Maybe February 2002". The Feb. 02 IESG last call period is more consistent with my proposal of a stable state for these documents (i.e. image/tiff and image/tiff-fx registration), especially in light of their simplicity. >