IETF58 and other issues
Avri Doria <[email protected]> Sat, 18 Oct 2003 09:57:47 +0900
| Newsgroups | gmane.ietf.gsmp |
|---|---|
| Message-ID | <[email protected]> |
Hi, While there has been a bit more traffic on the list and the work seems=20= to be moving forward, I am still not sure whether there is enough=20 activity at the moment to warrant a WG meeting in Minneapolis. I would like to hear, on the list, from anyone who has an issue that=20 they feel should be discussed at the meeting. I would also like to=20 hear from anyone who is submitting a draft and feels the need to=20 discuss it in the face to face forum. I will be submitting an update to the base draft later today or=20 tomorrow that includes fixes to the issues that Jay brought up in his=20 message. Basically I fixed the typos and added the extension block to=20= the configuration message. I also made some changes to the capability=20= set block. QAs the addition of the general extension block there did=20 not seem to work as well as it should i made the extension more=20 specific to the capability set functionality. I don't expect anyone=20 had tried to use it yet since they would have screamed, figuratively,=20 at me if they had. As usual, i will be looking for comments and issues=20= once it comes out. Finally, Kenneth and I are working on a rework of our schedule. We=20 have, obviously missed our remaining milestones by a long way. One of=20= the ideas we have had is to break the major milestone: > Dec 02 > =A0=A0 > Submit GSMPv3 extensions to include control of switches supporting=20 > optical, TDM and other CCAMP features and any updates of the base=20 > spec for Proposed Standard Into 3 milestones: - submit rewritten base and packet specification to the IESG for PS=20 consideration - submit optical spec to the IESG for PS consideration - submit tdm spec to the IESG for PS consideration the reason for subdividing them are: -the work of dividing up the spec as we have done was not planned when=20= the milestone where first written, it was the result of looking at the=20= effect of adding all of the TDM and Optical content to RFC 3292 and=20 realizing that it would be too cumbersome and insufficiently versatile.=20= It has also taken more effort then was originally thought as the=20 packet and base were so intimately intertwined in the original. -the base and packet specs together essentially reproduce the=20 functionality of current RFC 3292 and are, in my estimation, the=20 closest to being done. With a little bit of focus, they could be ready=20= for WG last call before IETF59. Additionally the current MIB,=20 RFC3295, covers this functionality and should need little or no=20 revision. -the optical spec and the tdm spec are individual documents and each=20 requires a supporting MIB. While the optical spec is in progress,=20 neither the TDM spec nor the MIBS are as of yet. So reasonable=20 schedules for these need to be worked out. Opinions? discussion? thanks a.=