Genart telechat review of draft-ietf-mboned-ieee802-mcast-problems-11
Pete Resnick via Datatracker <[email protected]> Wed, 08 Jan 2020 12:46:48 -0800
| Newsgroups | gmane.ietf.mboned,gmane.ietf.gen-art |
|---|---|
| Message-ID | <[email protected]> |
Reviewer: Pete Resnick Review result: On the Right Track I am the assigned Gen-ART reviewer for this draft. The General Area Review Team (Gen-ART) reviews all IETF documents being processed by the IESG for the IETF Chair. Please wait for direction from your document shepherd or AD before posting a new version of the draft. For more information, please see the FAQ at <https://trac.ietf.org/trac/gen/wiki/GenArtfaq>. Document: draft-ietf-mboned-ieee802-mcast-problems-11 Reviewer: Pete Resnick Review Date: 2020-01-08 IETF LC End Date: None IESG Telechat date: 2020-01-09 Summary: On the Right Track As far as I can tell, none of the issues I raised in the Last Call GenART review were ever addressed. _______________________________________________ MBONED mailing list [email protected] https://www.ietf.org/mailman/listinfo/mboned