Re: Scope of SA change in design document..
<[email protected]> Mon, 14 Nov 2005 15:43:58 +0200
| Newsgroups | gmane.ietf.mobike |
|---|---|
| Message-ID | <[email protected]> |
Francis Dupont wrote: > > The working group decided that it is not a concern to create > mutliple IKE SAs and did close issue 8. Thus there is no reason > to restart the discussion about this same issue again here. > > => there is a reason: an explicit request from the Monami6 WG. As > it is in the charter of Mobike IMHO the only thing the Monami6 WG > can do is this request. Now Monami6 people can raise a concern at > the last call for the design document and/or ask for a transfer of > this point between WGs' charters. BTW the Monami6 WG is supposed > to address real world concerns so I don't believe the Mobike WG > should ignore the message... I agree, we should not ignore the message. However, as we're basically finished with the MOBIKE base protocol, I don't think we should talk about "reopening issue 8", since that would be slightly misleading. What we can talk about is specifying an extension to the MOBIKE base protocol that would provide the functionality Monami6 would want. Determining what exactly the extension should do to satisfy Monami6 needs will take time (especially since Monami6 itself will take some time to stabilize -- after all, the WG was started less than two months ago), so it will be a separate document. Thus, this is not an "issue" for the MOBIKE base protocol document or the design document (which explains why the base protocol was done that way): it's a new work item for MOBIKE WG. Currently, the issue tracker at www.vpnc.org is only used to track issues for the base protocol document. New work items should be tracked by changing the milestones in the charter instead. Best regards, Pasi