Re: ASP Active
"Brian F. G. Bidulock" <[email protected]>
| Newsgroups | gmane.ietf.sigtran |
|---|---|
| Organization | http://www.openss7.org/ |
| Message-ID | <[email protected]> |
Stanislav, Stanislav Ivanovich wrote: (Thu, 22 Dec 2005 12:05:11) > > Shashank, > > > > Both M3UA and SUA in the same section 4.3.4.3. "ASP Active Procedures" > say: > > > > "By sending an ASP Active Ack message, the SGP or IPSP is now ready to > receive and send traffic for the related Routing Context(s). The ASP > SHOULD NOT send > > Data or SSNM messages for the related Routing Context(s) before > receiving an ASP ! Active Ack message, or it will risk message loss." > > > > Having in mind that ASP/IPSP is a process that runs one or several > applications the reference above says that process ASP/IPSP is not > allowed to SEND traffic on behalf of application A1 externally > represented with RC1 if the process has not activated itself in for > the A1 by sending RC1 to the SGP (or IPSP). Read the passage! It does not disallow anything. It makes a recommendation with regard to message loss. --brian -- Brian F. G. Bidulock [email protected] http://www.openss7.org/