Re: [SCTP] a small correction in RFC 4960
Michael Tüxen <[email protected]>
| Newsgroups | gmane.ietf.tsvwg,gmane.ietf.sigtran |
|---|---|
| Message-ID | <[email protected]> |
Hi Ash, yes, that is a (at least by me) known issue... This comes up, when you dimension your parameters to fullfil a given path error detection time... I'm not sure if we should start again an errata ID... Best regards Michael On Jun 12, 2008, at 6:36 AM, Ash Kat wrote: > Hello: > > 'Path.Max.Retrans' parmeters specifies the maximum number of > retransmission on a path before that path is marked down. > > Section 8.3 of RFC says: > When the value of this counter ""reaches"" the protocol parameter > 'Path.Max.Retrans', the endpoint should mark the corresponding > destination address as inactive if it is not so marked, and may > also > optionally report to the upper layer the change of reachability of > this destination address. > > This will make the Heartbeat to be re-transmitted one count less > then 'Path.Max.Retrans' > > This is correct in Section 8.2 which says: > When the value in the error counter ""exceeds"" the protocol > parameter > 'Path.Max.Retrans' of that destination address, the endpoint should > mark the destination transport address as inactive, and a > notification SHOULD be sent to the upper layer. > > So Section 8.3 should be modified and a path should be marked down > when error count exceeds 'Path.Max.Retrans'. > > Regards, > Ashwani Kathuria > > Bring your gang together. Do your thing. Find your favourite Yahoo! > Group.