RE: Reflecting new-MAM/SAM definition in diff-te drafts

Jim Boyle <[email protected]>
Newsgroups gmane.ietf.tewg
Message-ID <[email protected]>
So is there agreement now?

If so, what's the fallout?

I don't want to pull the reqt's out of IESG, and as stated in the list, it 
isnt the place MAM is defined (sorry SAM, I think we have enough bandwidth 
models).

Francois, can you re-propose changes for proto, RDM and MAM?

thanks,

Jim

btw... I also think LOMs are lots of complexity for little gain :)



On Tue, 20 May 2003, Francois Le Faucheur (flefauch) wrote:

> Jerry,
> 
> >> -----Original Message-----
> >> From: Ash, Gerald R (Jerry), ALABS [mailto:[email protected]] 
> >> Sent: 20 May 2003 17:35
> >> To: Dimitry Haskin; Francois Le Faucheur (flefauch)
> >> Cc: Ash, Gerald R (Jerry), ALABS; [email protected]; Lai, 
> >> Wai S (Waisum), ALABS
> >> Subject: RE: Reflecting new-MAM/SAM definition in diff-te drafts
> >> 
> >> 
> >> Dimitry, Francois,
> >> 
> >> > >     o SUM (Reserved (CTc)) <= Max Reservable Bandwidth, 
> >> > >         for all "c" in the range 0 <= c <= (MaxCT-1)
> >> > > 
> >> > > However, this formula is incorrect for DS-TE when per-CT 
> >> > > LOM's are used, since the above formula only reflects the Max 
> >> > > Reservable Bandwidth for the entire link, and does not 
> >> > > reflect the per-CT local overbooking factors.  So what 
> >> > > formula do you suggest when per-CT LOM's are used?
> >> 
> >> > Wouldn't 'Reserved (CTc)' it the above formula already 
> >> accounts for the
> >> > overbooking multiplier at CTc?  I don't see how this 
> >> formula precludes
> >> > per-CT LOM's to be used. Please explain.
> >> 
> >> Are you then proposing these formulas:
> >> 
> >> 1. When per-CT LOMs are not used:
> >> 
> >>      o SUM (Reserved(CTc)) <= Max Reservable Bandwidth, 
> >>          for all "c" in the range 0 <= c <= (MaxCT-1)
> >> 
> >> 2. When per-CT LOMs are used:
> >> 
> >>      o SUM (Normalized(CTc)) <= Max Reservable Bandwidth, 
> >>          for all "c" in the range 0 <= c <= (MaxCT-1)
> >> 
> >> Is that correct?  Please confirm, and/or give the formulas 
> >> you propose.
> 
> Yes, this is exactly what I propose.
> I think this is similar to what you were proposing, only using "Max Res
> Bw" instead of "Max Link Bw". 
> 
> Sorry I didn't make that very clear before.
> 
> Cheers
> 
> FRancois
> 
> >> 
> >> Thanks,
> >> Jerry
> >> 
> 
> 
> 
>
lmpx.com only provides a reader for public news (NNTP) servers. It is not affiliated with the servers or forums shown here and is not responsible for the content of articles, which is written by their respective authors.