patch tracking
"Fang, Ying" <[email protected]>
| Newsgroups | gmane.linux.ataraid |
|---|---|
| Message-ID | <39B20DF628532344BC7A2692CB6AEE07017DFD6E@orsmsx420.amr.corp.intel.com> |
Hello,
As the development pace is faster than that of release, I'm wondering
how the patch tracking works. For example, there are two outstanding
patches for rc14:
Patch1: a new feature added on rc14.
Patch2: a bug fix at the rc14.
A new patch Patch3 is required to fix a bug caused by Patch1. Is it to
possible to recall Patch1? If not, should Patch3 include Patch1 change
when diff is applied?
In addition, another new feature is developed based on all the changes
from patch 1 to 3. What is the diff against rc14 or
(rc14+Patch1+Patch2+Patch3)?
Thanks,
Ying
_______________________________________________
Ataraid-list mailing list
[email protected]
https://www.redhat.com/mailman/listinfo/ataraid-list