Re: 11.7 planning
Luna Jernberg <[email protected]>
| Newsgroups | gmane.linux.debian.devel.release,gmane.linux.debian.devel.cd,gmane.linux.debian.devel.boot |
|---|---|
| Message-ID | <CADo9pHhqhLPQn78qbVUoB54MQnJRPQEWnGY=Y1y7doZ+KLdEBw@mail.gmail.com> |
If you want my help with testing i can do the later April dates 15th, 22nd and 29th On 3/15/23, Jonathan Wiltshire <[email protected]> wrote: > Hi, > > We're overdue for 11.7 and need it done with a keyring update included > before bookworm can be released. The wheels are turning on the keyring so > how do dates in April look for everybody? Saturdays are 1st (probably too > soon), 8th, 15th, 22nd and 29th. > > Thanks, > > -- > Jonathan Wiltshire [email protected] > Debian Developer http://people.debian.org/~jmw > > 4096R: 0xD3524C51 / 0A55 B7C5 1223 3942 86EC 74C3 5394 479D D352 4C51 > ed25519/0x196418AAEB74C8A1: CA619D65A72A7BADFC96D280196418AAEB74C8A1 > >