Re: 11.7 planning
Jonathan Wiltshire <[email protected]>
| Newsgroups | gmane.linux.debian.devel.release,gmane.linux.debian.devel.cd,gmane.linux.debian.devel.boot |
|---|---|
| Message-ID | <[email protected]> |
On Wed, Mar 15, 2023 at 08:33:47PM +0000, Jonathan Wiltshire wrote: > We're overdue for 11.7 and need it done with a keyring update included > before bookworm can be released. The wheels are turning on the keyring so > how do dates in April look for everybody? Saturdays are 1st (probably too > soon), 8th, 15th, 22nd and 29th. So 29th April is the earliest viable option; announcements to follow. -- Jonathan Wiltshire [email protected] Debian Developer http://people.debian.org/~jmw 4096R: 0xD3524C51 / 0A55 B7C5 1223 3942 86EC 74C3 5394 479D D352 4C51 ed25519/0x196418AAEB74C8A1: CA619D65A72A7BADFC96D280196418AAEB74C8A1
signature.asc
(application/pgp-signature, 228 B)
-----BEGIN PGP SIGNATURE----- iHUEABYKAB0WIQTdFzjfLGn8URFmteMDXuYJgEtROQUCZBXKwQAKCRADXuYJgEtR OW4qAP0ShXcXoTNhHSmX1FH7/EFN+06A6TFuPhaFhIg4fy6VAQD/crs2Gf4bCC4G pfs1ZxpUd1Z2HIpI11zePCwNVPXf+QA= =451D -----END PGP SIGNATURE-----