Re: 11.7 planning

Jonathan Wiltshire <[email protected]>
Newsgroups gmane.linux.debian.devel.release,gmane.linux.debian.devel.cd,gmane.linux.debian.devel.boot
Message-ID <[email protected]>
On Wed, Mar 15, 2023 at 08:33:47PM +0000, Jonathan Wiltshire wrote:
> We're overdue for 11.7 and need it done with a keyring update included
> before bookworm can be released. The wheels are turning on the keyring so
> how do dates in April look for everybody? Saturdays are 1st (probably too
> soon), 8th, 15th, 22nd and 29th.

So 29th April is the earliest viable option; announcements to follow.

-- 
Jonathan Wiltshire                                      [email protected]
Debian Developer                         http://people.debian.org/~jmw

4096R: 0xD3524C51 / 0A55 B7C5 1223 3942 86EC  74C3 5394 479D D352 4C51
ed25519/0x196418AAEB74C8A1: CA619D65A72A7BADFC96D280196418AAEB74C8A1
signature.asc (application/pgp-signature, 228 B)
-----BEGIN PGP SIGNATURE-----

iHUEABYKAB0WIQTdFzjfLGn8URFmteMDXuYJgEtROQUCZBXKwQAKCRADXuYJgEtR
OW4qAP0ShXcXoTNhHSmX1FH7/EFN+06A6TFuPhaFhIg4fy6VAQD/crs2Gf4bCC4G
pfs1ZxpUd1Z2HIpI11zePCwNVPXf+QA=
=451D
-----END PGP SIGNATURE-----
lmpx.com only provides a reader for public news (NNTP) servers. It is not affiliated with the servers or forums shown here and is not responsible for the content of articles, which is written by their respective authors.