The promised 4-6 weeks following release for 12.1 looks like:

 8th July (4)
15th July (5)
22nd July (6)

The first of them would combine with a very stretched 11.8; SRM might
prefer to get 11.8 done earlier and leave more time for 12.1 to mature.