Re: 12.1 planning
Donald Norwood <[email protected]>
| Newsgroups | gmane.linux.debian.devel.cd,gmane.linux.debian.devel.release,gmane.linux.debian.devel.boot |
|---|---|
| Organization | Debian |
| Message-ID | <[email protected]> |
Hi On 6/19/23 17:04, Jonathan Wiltshire wrote: > Hi, > > The promised 4-6 weeks following release for 12.1 looks like: > > 8th July (4) > 15th July (5) > 22nd July (6) > If the 8th is doable Press can do it and the 15th, would prefer the 15th or 22nd. -- Be well, -Donald -- - ⢀⣴⠾⠻⢶⣦⠀ ⣾⠁⢠⠒⠀⣿⡁ Donald Norwood ⢿⡄⠘⠷⠚⠋⠀ B7A1 5F45 5B28 7F38 4174 ⠈⠳⣄⠀⠀⠀⠀ D5E9 E5EC 4AC9 BD62 7B05
OpenPGP_signature
(application/pgp-signature, 840 B) - not displayed