Re: 12.1 planning

"Adam D. Barratt" <[email protected]>
Newsgroups gmane.linux.debian.devel.cd,gmane.linux.debian.devel.release,gmane.linux.debian.devel.boot
Message-ID <6fcce497646ed7c1a70755ce1c7e4deb0ac0b6fb.camel@adam-barratt.org.uk>
On Mon, 2023-06-19 at 22:04 +0100, Jonathan Wiltshire wrote:
> The promised 4-6 weeks following release for 12.1 looks like:
> 
>  8th July (4)
> 15th July (5)
> 22nd July (6)
> 

Any of those should work for me. I'd prefer one of the latter two.

> The first of them would combine with a very stretched 11.8; SRM might
> prefer to get 11.8 done earlier and leave more time for 12.1 to
> mature.

That's not entirely accurate, but I'll expand in the 11.8 thread.

Regards,

Adam