Re: 12.1 planning
"Adam D. Barratt" <[email protected]>
| Newsgroups | gmane.linux.debian.devel.cd,gmane.linux.debian.devel.release,gmane.linux.debian.devel.boot |
|---|---|
| Message-ID | <6fcce497646ed7c1a70755ce1c7e4deb0ac0b6fb.camel@adam-barratt.org.uk> |
On Mon, 2023-06-19 at 22:04 +0100, Jonathan Wiltshire wrote: > The promised 4-6 weeks following release for 12.1 looks like: > > 8th July (4) > 15th July (5) > 22nd July (6) > Any of those should work for me. I'd prefer one of the latter two. > The first of them would combine with a very stretched 11.8; SRM might > prefer to get 11.8 done earlier and leave more time for 12.1 to > mature. That's not entirely accurate, but I'll expand in the 11.8 thread. Regards, Adam