Re: 11.8 planning
Donald Norwood <[email protected]>
| Newsgroups | gmane.linux.debian.devel.release,gmane.linux.debian.devel.cd,gmane.linux.debian.devel.boot |
|---|---|
| Organization | Debian |
| Message-ID | <[email protected]> |
Hi, On 6/20/23 13:15, Adam D. Barratt wrote: > The traditional cadence for oldstable point releases is four months, > rather than two. That technically means that 11.8 would be due > somewhere in late August to mid-September. So we could either punt 11.8 > so it aligns with 12.2 rather than 12.1, or do 11.8 together with 12.1 > and then align 11.9 with 12.3. > ... > The 1st would mean freezing this coming weekend, which is very tight. > > As per the 12.1 mail, either the 8th or 15th would work for me, with a > preference for the latter. Given the explanation above though, I think > the 22nd would be fine for 11.8 as well. I think pushing everything forward at this time would be advisable as several people have indicated that they need a breather. A slight delay may be ideal. -- Be well, -Donald -- - ⢀⣴⠾⠻⢶⣦⠀ ⣾⠁⢠⠒⠀⣿⡁ Donald Norwood ⢿⡄⠘⠷⠚⠋⠀ B7A1 5F45 5B28 7F38 4174 ⠈⠳⣄⠀⠀⠀⠀ D5E9 E5EC 4AC9 BD62 7B05
OpenPGP_signature
(application/pgp-signature, 840 B) - not displayed