11.8/12.2 planning
Jonathan Wiltshire <[email protected]>
| Newsgroups | gmane.linux.debian.devel.cd,gmane.linux.debian.devel.release,gmane.linux.debian.devel.boot |
|---|---|
| Message-ID | <[email protected]> |
I think I confused matters with my messy thread; let's start again. I originally suggested: Jonathan Wiltshire <[email protected]> (2023-06-28): > The proper cadence for 11.8 and 12.2 is the weekend of 30th September > 2023. Please indicate your availability for: > > 23 Sep > 30 Sep (preferred) > 7 Oct Let's say 30 Sep is still preferred, 7th Oct or at a stretch 14th Oct are options. Please indicate your availability for those three. Thanks, -- Jonathan Wiltshire [email protected] Debian Developer http://people.debian.org/~jmw 4096R: 0xD3524C51 / 0A55 B7C5 1223 3942 86EC 74C3 5394 479D D352 4C51 ed25519/0x196418AAEB74C8A1: CA619D65A72A7BADFC96D280196418AAEB74C8A1
signature.asc
(application/pgp-signature, 228 B)
-----BEGIN PGP SIGNATURE----- iHUEABYKAB0WIQTdFzjfLGn8URFmteMDXuYJgEtROQUCZL7CBQAKCRADXuYJgEtR OfTZAP9DCQBqjZIfOwgFUDgfHLVtdS6H6DIB7Hamgw5jlMZnDgEA5P/2FBQ5G8JR o6mto1YGS1uMKOTa6ShD0jaksiqEqw0= =2q2p -----END PGP SIGNATURE-----