Re: stress-ng process termination issue

Michael Kelly <[email protected]>
Newsgroups gmane.linux.debian.ports.hurd
Message-ID <[email protected]>
On 31/07/2025 10:41, Samuel Thibault wrote:
> It's quite probable, as swapping is a very involved vm thing and we do
> know that there are some issues with it, we see sometimes odd build
> failures on buildds due to this.
>
> Perhaps you can tune the stress-ng scenarii to isolate the termination
> test that you are after from swapping concerns.

I think that is possible and worth a try. The process termination is 
currently slowed significantly after the high pageout during the test 
run which is why the SIGKILL is required at all. The stress-ng 
termination signal sequence is SIGALRMx4, SIGTERM then SIGKILL with a 
small time between signals. I could change that to SIGALRM then SIGKILL 
and lower the time interval to see if I can get a SIGALRM being 
processed whilst SIGKILL is delivered without swapping having taken place.

I'd like to try and find the cause of the swapping bugs so I'll also 
continue with the existing test case.

Regards,

Mike.
lmpx.com only provides a reader for public news (NNTP) servers. It is not affiliated with the servers or forums shown here and is not responsible for the content of articles, which is written by their respective authors.