Re: Preparation for 1.0 release
Jason Townsend <[email protected]>
| Newsgroups | gmane.network.fire.devel |
|---|---|
| Message-ID | <[email protected]> |
Thanks for the outline, Alan. This looks good to me. On Oct 27, 2003, at 1:02 PM, Alan Humpherys wrote: > We've been working on the 1.0 release for quite some time now, and > 0.32 is getting a bit long in the tooth. I was talking with Jason > last night, and we both felt that it was important to make a big push > to get 1.0 out to the world. > > Also, there are some bugs in 0.32.g that need fixed immediately: > > With that in mind, I propose that we do the following: > > 1) November 1 - (0.32.h) > Release 0.32.h containing: > - Fix for 10.1 crash upon connection to MSN > - Proper flags to connect to Jabber-SSL (build issue) > - Fix for hang during MSN connection on some systems. > > Jason would take the lead on this release. In addition, any high value/low risk bug fixes would be eligible for this release. Let me know if anything comes to mind. > 2) November 7 - (1.0 UI Freeze) > Get 1.0 to a UI frozen state with as many bugs fixed as possible. > - This includes all strings & NIBs > Release a 1.0 preview (alpha) to the members of the mailing lists. > > 3) November 21 - (Localized Beta Refresh) > Complete all localizations (this gives 2 weeks from the UI freeze) > Fix all 1.0 Blocker bugs > Fix as many 1.0 candidate bugs as possible > Release a 1.0 preview refresh (Beta) to the members of the mailing > lists. > > 4) December 5 - (1.0 FCS) > Fix issues found during alpha/beta testing > Fix all 1.0 candidate bugs (unless deferred) > (Likely to have one or more Beta refresh builds during this time.) > Update website and help documentation for 1.0 > > ======================= > > With that schedule in mind, here are some questions that I need > answered: > > Developers (especially the core team) > Can you get the UI/strings complete on your features/fixes by > November 7? (2 weeks!) I can complete the Colors pref in that time (and the removal of Colors from other pref panes). I would like to have some sort of Themes pref as well which hopefully I can do in time for 1.0. In order to meet the schedule we may need to postpone some of the pref reorg changes that were discussed. > Can you contribute significantly to fixing the 1.0 bugs by November > 21? (4 weeks!) > We have: > 18 blocker bugs > 49 candidate bugs > 50 bugs we are deferring > (perhaps more will be entered) I will be able to work on Fire in the evenings and weekends over the next few weeks. > Localizers > Do you have the time to localize Fire between November 7 and November > 21 (2 weeks!) > > Can each of you who plan on assisting with this effort please respond > with your availability so that we can plan accordingly? > > (By the way, Graham, we are not planning on your Conversation branch > being a part of 1.0) > > Also, we would like to use the bug/feature trackers on sourceforge to > track progress on fixing these issues. Please take a look at the bugs > in the 1.0 Candidate and 1.0 blocker groups and take ownership of the > ones you are going to work on. (There are a lot still assigned to > 'nobody') If you don't know how to use that bug tracker, please > contact me and I can help. -Jason ------------------------------------------------------- This SF.net email is sponsored by: The SF.net Donation Program. Do you like what SourceForge.net is doing for the Open Source Community? Make a contribution, and help us add new features and functionality. Click here: http://sourceforge.net/donate/