Re: Release timeline

Bart Van Assche <[email protected]>
Newsgroups gmane.network.net-snmp.devel
Message-ID <[email protected]>
On 2020-06-29 07:11, Wes Hardaker via Net-snmp-coders wrote:
> Hugh McMaster <[email protected]> writes:
> 
>> net-snmp v5.8.1.pre2 was released a little over four months ago.
>>
>> Following a lot of excellent work by Bart and others since then, what
>> is the proposed timeline for the next pre-release or final v5.8.1?
> 
> We don't have a good proposed timeline.  So let's come up with one:
> 
> + We could release 5.8.1.pre3 this week
>     + (and people should test it)
> + We could then freeze development in that  branch and shift into
>   release mode
> + Push 5.8.1.rc1 next week and start "really freezing"
> 
> Is there consensus that 5.8.1 is "ready" to really lock down.  It's
> certainly beyond time it gets out the door.

Not sure what others think but I'm fine with locking down 5.8.1.

Thanks,

Bart.
lmpx.com only provides a reader for public news (NNTP) servers. It is not affiliated with the servers or forums shown here and is not responsible for the content of articles, which is written by their respective authors.