RE: Bank of America Tower
"Ralph Sims" <[email protected]>
| Newsgroups | gmane.network.wireless.seattle.devel |
|---|---|
| Message-ID | <[email protected]> |
There is physical space available and the cost is representative of the location. The site is not managed by the Tower but through a company that specializes in this type of installation. There are quite a few requirements to meet prior to being able to put equipment in place and even afterwards. That being said, there's no "RF space" available in either the 2.4 or 5.8 bands. It's ideal for the licensed bands. > We talked about it a long time ago. Apparently their roof is > at capacity (no more space for antennas), and the cost is > pretty astronomical. _______________________________________________ Dev mailing list [email protected] http://seattlewireless.net/mailman/listinfo/dev