Weekly update

"Seth Moody" <[email protected]>
Newsgroups gmane.org.clubs.gobiodiesel.mixmasters
Message-ID <[email protected]>
Trying to reinforce the idea that fuel doesn't just appear out of
the sky.  We make it and if we don't make it and train more people to
make it there will be very little or none for distribution.  I think
you all know this but beginning to get mystified looks when I have to
tell people that there is no fuel for distribution because a we have a
backlog in washing.  Hopefully we will not have this problem nearly as
much as the mixmasters on Friday and Saturday spent time getting more
totes cleaned up so that we have a full tote available for our second
stage washing

You guys did a great job when I just threw you into titration mode.
We had a few technical difficulties(methoxide mixer leaking(fixed),
cold scale doesn't like to operate(engine preheat for the scale), poly
lines disintegrating(make new line), shortage of power,(Generator now
operational(thanks Tom)) but just have to remember to cut
the problem into little bits and solve each little bit.

By the way, Tom spent a bit of time troublshooting the generator and
found all it really needs is to be moved out of its cover when running
so it gets better intake airflow and cooling, so we now have an
additional energy source for pumping crews and mixmasters.
YEEAAHHH!!!

I want to give the Mixmaster crew and oil support crew a huge hand this week.
1. Oil consolidation is moving rapidly toward sustainable levels with
the addition of two more
    clean totes for oil and a clean tote for the new wash vessel.
2. Generator back online so we now have an additional source of power
for both crews.
    By the way, we need to find some fat tires for the generator cart
so it can be easily
    moved from spot to spot on the site.
4.  Batch of fuel made
5.  Batch of fuel filtered
6.  Batch of fuel washed.
7.  The South side of the Conex is nearly clear of totes, barrels and pallets.
     This means we will be able to begin leveling and preping the
10X12 area for ground
     breaking on our new processor shed.


Should have 100 gallons of dry fuel ready for distribution on
Saturday, keep the fingers crossed, if things go well Friday and
Saturday morning.

Food for thought:
Something I have been doing is trying to give people an idea of what
is coming for the weekend work party.  It really helps to take a look
at what is on tap for the work party and imagine(visualize) yourself
doing each step of the task. I find this works for me very well and
especially when a problem occurs I am able to identify and solve a
problem much more quickly.


Here is the June Calender.
It looks very empty at this time.
Again let me know days that you are available for a work party, be it
a Friday or Saturday I will then put you on the calender for the
requested day and when I make the weekly announcements with the
calender attached you will be able to see where you've been tasked.

Have a great week.

Hope to see you at the work party.


Not so oily anymore(moving a bit quicker),

Seth

_______________________________________________
mixmasters mailing list
[email protected]
http://lists.gobiodiesel.org/mailman/listinfo/mixmasters
06 Mixmaster Calender.doc (application/msword, 29.5 KB) - not displayed
lmpx.com only provides a reader for public news (NNTP) servers. It is not affiliated with the servers or forums shown here and is not responsible for the content of articles, which is written by their respective authors.