Discussion today with Ron re: electrical upgrade &repair
Zac Imboden <[email protected]> Tue, 10 Oct 2006 17:32:12 -0700
| Newsgroups | gmane.org.clubs.gobiodiesel.mixmasters |
|---|---|
| Message-ID | <[email protected]> |
Here are my notes from the discussion Thom and I had with Ron on site regarding repairing our faulty relay and also how to proceed with the electrical upgrade. From Ron, here is the process he believes we should follow to get our power drop: I. The Power Drop 1) Find out how the site is currently zoned? Is it "owner/builder" or some other classification. 2) Contact electric company (who is that for our site area?) and tell them we want a 200 amp drop with the option to add another 200 amp drop in the future. 3) Get Red's down to inspect our existing wiring. Find out if we need to make changes to existing wiring to pass inspect. 4) Request Red's to apply to the city for a permit for the new drop. 5) Have Red's or Ron install the box (if he's willing). 6) City will come and inspect the box and could potentially inspect our other wiring. 7) Once city approves, they will give electric company ok to drop power. 8) Schedule Electric company to come out and install the power drop. II. Relay repair for our reactor heater and thermostat Ron agreed to repair our broken relay and replace the connectors. He believes the connectors are not the right quality for the amount of time we are pulling electricity through them. Better connectors will require a larger housing. He agreed to purchase these items once he is sure of our reimbursement process. -------------------------------------------------------------- Zac Imboden [email protected] 1534 SE 35th Place Portland, OR 97214 971-563-2477 _______________________________________________ mixmasters mailing list [email protected] http://lists.gobiodiesel.org/mailman/listinfo/mixmasters