Site/Processor Planning Meeting
Pete Kramer <pete_kramer2-/[email protected]> Thu, 14 Dec 2006 17:54:14 -0800 (PST)
| Newsgroups | gmane.org.clubs.gobiodiesel.mixmasters |
|---|---|
| Message-ID | <[email protected]> |
OK, just another reminder of the meeting this Sat morning. If you can make it, please let me know. Below is the agenda. Review and bring any questions/concerns so we can be sure we are all bought into the format and content for this meeting. WHAT: Site Planning Meeting WHERE: Co-op Site WHEN: Saturday, Dec 16; 9am SHARP!- ~11am So far, those attending are: Pete K, Zac, Kevin Wheeler, John Sorenson, Felix, Greg R, Ron? Please refer to this link for most recent, PROPOSED site layout. http://www.gobiodiesel.org/index.php?title=Site_design Thanks Pete Kramer -------------------------------------------- Site Planning Mtg #4 Agenda (on-site, Sat, Dec 16, 9-11am) (Meeting at Felix’s house on 12/12/06 was mtg #3) Check-in Ground rules for mtg Cover agenda, agree on agenda, stick to agenda Each section will be open for input, NOT questions Respect the whole agenda, timing I will interrupt, I apologize, don’t take it personally This meeting is set-up for failure, but can still be productive Cover agenda IMMEDIATE Processor/Site Upgrades (next 1-15+ days); 90% vision (1 hr total) Fuel producing process, stays the same (<5 min) Site layout, physical location of components (<5 min) Seal processors (20 min) Seal lids Eductors Additional fittings Good insulation ideas Electrical needs (20 min) Methoxide mixer needs; location, air compressor, tubing (5 min) Pumps needed (<5 min) General hose/fittings needed (<5 min) Misc needs (pump tagging, vessel tagging, shed lighting…) (<5 min) Near future Processor/Site Upgrades (start now –complete by March 1?); 40% vision (30 min total) Fuel producing process, some basic changes? (10 min) Site layout, physical location of components (5 min) Methoxide mixer and methanol storage Location and use of 650 gal tanks WVO storage Waste water storage Glycerin storage & use (Co-products cmte task) Electrical needs (10 min) Additional pumps, hose/fittings, misc needs (5 min) Future Processor/Site Upgrades (start March–complete by Aug 1, 2007?); 20% vision (10 min total) Code compliance (<5 min) Fuel producing process??? (<5 min) Site layout (5 min) Concrete slab w/ containment walls Large metal shed for all or most of processing? Electrical needs (<5 min) Fuel Quality and Testing (10 min) test fuel ASAP; status? Amanda test fuel at UofO in Corvallis, status? Seth –testing fuel at PSU?.. Misc needs not discussed? Issues? (10 min total) ____________________________________________________________________________________ Have a burning question? Go to www.Answers.yahoo.com and get answers from real people who know. _______________________________________________ mixmasters mailing list [email protected] http://lists.gobiodiesel.org/mailman/listinfo/mixmasters