update from Saturday

Felix Kersting <[email protected]> Thu, 18 Jan 2007 23:02:36 -0800
Newsgroups gmane.org.clubs.gobiodiesel.mixmasters
Message-ID <[email protected]>
Here is Ron's report on what was done on Saturday 1/13:

Current status:

1.   Two newly cleaned totes for wvo and fuel. (Kevin cleaned these.)
2.   Wvo tank plumbed to holding tote.
3.   One pump plumbed to wvo tank and tote.
4.   One processor plumbed with pump.
5.   One water heater for heating oil connected.
6    Micron sock filter mounted.

To do list:

Short term:
1.   Insulate processors
2.   Relocate wash and fuel settling totes to their proper places
3.   Install through-the-wall valve on fuel settling tote
4.   Install correct sprinkler heads to wash tank
5.   Splice tubing for methoxide dispensing
6.   Put water in hot water heater
7.   Install water separator filter to fuel dispensing tote

To do list:

1.   Isulate processors
2.   Relocate wash and fuel settling totes to their proper places
3.   Install through-the-wall valve on fuel settling tote
4.   Install correct sprinkler heads to wash tank
5.   Splice tubing for methoxide dispensing
6.   Put water in hot water heater
7.   Install water separator filter to fuel dispensing tote
8.   Move stairs to square off with wvo tank
9.   Clean more totes to move glycerin/methnol from barrels
10. Begin cleanup of site:   garbage, carboys, barrels, wvo, etc.

_______________________________________________
mixmasters mailing list
[email protected]
http://lists.gobiodiesel.org/mailman/listinfo/mixmasters
Re: Saturday work party (message/rfc822, 9.2 KB) - not displayed