You'd need a VERY long duct run on the roof to get any kind of real  
"pre-cooling" via conduction.   I suppose you could force the air  
through an air/air heat exchanger but that's usually not very  
efficient so its not done very often.

Our datacenter is on the lower level of the building with two floors  
of office space above it.  We have considered that the heat we  
generate downstairs could keep the offices warm without burning oil/ 
gas, but trying actually do that and maintain a balanced system is  
easier said than done.

Free cooling is one of the holy grails of datacenter operation.  If  
anyone figures out a way, please let us know.  :-)


Drew Linsalata
The Gotham Bus Company, Inc.
Colocation and Dedicated Server Solutions
http://www.gothambus.com



On Mar 4, 2008, at 10:28 AM, Kevin Kargel wrote:

>  I have often wondered about having a long tin tunnel on
> the roof to duct air through to pre-cool it without opening the
> environment, but not being an HVAC engineer I am sure there are  
> reasons
> beyond my ken why they don't do that.
>
-- 
Eat sushi frequently. - Avi
[email protected] is the human contact address.
[email protected] is the list posting address.
See below URL for subscribe/unsubscribe and list options:
http://inet-access.net/mailman/listinfo/list
lmpx.com only provides a reader for public news (NNTP) servers. It is not affiliated with the servers or forums shown here and is not responsible for the content of articles, which is written by their respective authors.