Re: Data Center Facility Costs
"Laurence F. Sheldon, Jr." <[email protected]>
| Newsgroups | gmane.org.operators.internet-access |
|---|---|
| Organization | Maybe tomorrow |
| Message-ID | <[email protected]> |
Kevin Kargel wrote:
> You guys got me curious, so I called and checked.. here in Park River,
> ND , the small installation charge for power is .074/kwh (either 1 phase
> or 3 phase), and for large installations (I am guessing that means big
> enough to get your own transformer, or over 200 Amps, or something) the
> cost is .0645/kwh .
>
> Of course the main advantage here is that real estate is cheap enough
> that you can buy a building with your mastercard.. lol..
With the legal climate there (e.g Sierra v. Ritz) I wouldn't want to
risk operating there.
--
Requiescas in pace o email Two identifying characteristics
of System Administrators:
Ex turpi causa non oritur actio Infallibility, and the ability to
learn from their mistakes.
http://members.cox.net/larrysheldon/ (Adapted from Stephen Pinker)
--
Eat sushi frequently. - Avi
[email protected] is the human contact address.
[email protected] is the list posting address.
See below URL for subscribe/unsubscribe and list options:
http://inet-access.net/mailman/listinfo/list