Re: Feature request re repeat enhancements
Mimi Yin <[email protected]>
| Newsgroups | gmane.org.osaf.design |
|---|---|
| Message-ID | <[email protected]> |
Hi Keith, Thanks for the suggestion, especially the use cases. I've logged a design bug to keep track of this: https:// bugzilla.osafoundation.org/show_bug.cgi?id=10905 Mimi On Sep 25, 2007, at 5:05 PM, Keith Winsor wrote: > Reposting, but this time to the correct address... > > Having recently migrated from DateBk5 on a now-defunct Palm to > Chandler on a UMPC and Tablet, one feature I'm really missing is a > 'repeat from check off' function. > > Example: our ageing grandfather clock needs winding every 6 days. > In DateBk, this is set up as an event repeating every 6 days, with > a tick in the 'from check off' box. If I can't do it on the day, > the overdue event continues to have 'Now' status until I get round > to doing it, at which point marking it as done generates a repeat > in six days time from now. > > This is ideal for those things that have to be done at regular > intervals, but that can slip for a day or two: give cat worm > tablet, check car tyre pressures, do monthly review, etc, where, > having slipped, you don't want to go back to the original schedule. > > Hope this makes sense. > > Keith > > PS Can't believe how useful even 0.7 is - it just sort of works how > I do! > > > _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ > > Open Source Applications Foundation "Design" mailing list > http://lists.osafoundation.org/mailman/listinfo/design _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Open Source Applications Foundation "Design" mailing list http://lists.osafoundation.org/mailman/listinfo/design