Re: Date become crazy on footer
"Daniel E. Macks" <[email protected]> Tue, 17 May 2005 18:23:22 +0000 (UTC)
| Newsgroups | gmane.os.apple.fink.i18n |
|---|---|
| Message-ID | <[email protected]> |
BABA Yoshihiko <[email protected]> said: > > There are several issues about the dates in the footer. I think I > can fix them as follows: > > 2. XML based PHP files: > (Crrent) The date is put from the original XML file. If XML file is > edited, and PHP files are generated before the XML file is > committed, the author/date copied from XML file is about the > previous commit. Right. That's why that is not the order of operations one uses. "Commit then generate then commit" is the way. The whole goal is for the generated page to say what its source is (i.e., CVS Id: the revision code of the source is at least as important as the date) which is only set during the commit of the source. dan -- Daniel Macks [email protected] http://www.netspace.org/~dmacks ------------------------------------------------------- This SF.Net email is sponsored by Oracle Space Sweepstakes Want to be the first software developer in space? Enter now for the Oracle Space Sweepstakes! http://ads.osdn.com/?ad_id=7412&alloc_id=16344&op=click