Temporary Routing/Switching backup with Backplane and multiple switch cards...
"Martes G Wigglesworth" <[email protected]>
| Newsgroups | gmane.os.freebsd.isp |
|---|---|
| Organization | M.G. Wigglesworth Holdings, LLC |
| Message-ID | <[email protected]> |
I was wondering if anyone else has attempted to compliment their routing devices or switching devices with a back-plane and multiple switch cards or E1/T1 cards with any success? Meaning that it was worth the trouble to build. This seems a bit useless initially, however, I am doing some research into this for quick-fix disaster recovery systems in case the 3800s are down, etc... A bit home-grown, but would like to know if the design idea would be viable and not just a costly home-grown project... Maybe for a small point of present in a wireless environment which has multiple E1/T1 drops to terminate for back-haul transfer central management stations, etc... _______________________________________________ [email protected] mailing list http://lists.freebsd.org/mailman/listinfo/freebsd-isp To unsubscribe, send any mail to "[email protected]"