Re: Scheduling of Components with DeployerComponent and Xml File
Peter Soetens <[email protected]>
| Newsgroups | gmane.science.robotics.orocos.devel |
|---|---|
| Message-ID | <CAMYDobVEvFq8c9FjEuQnFno0CYWanoJWUqNeDv75qUgAZ3gFPw@mail.gmail.com> |
Hi Marcello, On Fri, Jan 25, 2013 at 7:03 AM, <[email protected]> wrote: > Hi, > > we use the OCL Deployer to start our components via an Xml file. During our > tests, I noticed that all components were using the ORO_SCHED_RT even though > some were configured to use ORO_SCHED_OTHER. Our components use an non > periodic activity. > > Looking in the DeploymentComponent.cpp file I found, what I believe to be a > bug on line 1088. Here there is a 2nd deceleration of int scheduler (first > declared in line 1086). This means, that the value from the file (returned by > the function 'string_to_oro_sched') has no effect because the 2nd variable > 'scheduler' goes out of scope at the end of the if-statement. Since the 1st > 'scheduler' is set to ORO_SCHED_RT by default, it is not possible to start a > non periodic activity in ORO_SCHED_OTHER with an Xml file configuration. > > By removing the 'int' in front of the 2nd 'scheduler' the code worked as > expected. Thanks for reporting ! I've pushed the fix to the toolchain-2.6 branch. Peter -- Orocos-Dev mailing list [email protected] http://lists.mech.kuleuven.be/mailman/listinfo/orocos-dev