Re: lack of minutes/summary for calls

Alan Coopersmith <Alan.Coopersmith-UdXhSnd/[email protected]> Tue, 25 Jan 2005 07:53:38 -0800
Newsgroups gmane.comp.freedesktop.release-wranglers
Message-ID <[email protected]>
The bulk of discussion on recent calls is summed up in the updates to the
bugs in bugzilla to mark which ones were approved/deferred/rejected for
inclusion in 6.8.2.  It would be good to get some notes out on the rest of
the matters discussed though.

 From memory, a brief summary of yesterdays call:
   - Reviewed remaining bugs.
   - Decided to give one week for RC3 testing from when Roland finishes
     checking in the patches (or was it two weeks?)
   - Decided to take no more bugfixes into 6.8.2 other than showstoppers.
   - Decided to have another call on Friday (or was it Monday?) to update
     progress towards release.

Hmm...maybe someone else should do this - someone with either notes or a
better memory than mine.

	-alan-

Donnie Berkholz wrote:
> -----BEGIN PGP SIGNED MESSAGE-----
> Hash: SHA1
> 
> It would be deeply appreciated if someone who attends the rw calls could
> write up some sort of summary of what went on, if not a complete
> minutes. This would contribute to the open development environment and
> leave people like me feeling less clueless about what's going on.
> 
> As is, I'm reduced to hearing rumors from people who've been on the
> call, or sometimes people who have talked to people who were on the call.
> 
> Thanks,
> Donnie
> -----BEGIN PGP SIGNATURE-----
> Version: GnuPG v1.4.0 (GNU/Linux)
> 
> iD8DBQFB9e/OXVaO67S1rtsRAumfAJ4rDZWT0E1/49qSpm5AzPM0ygtXlACg+OMS
> r8FHTGTbdiMuLSCHOAm+v/U=
> =pMWB
> -----END PGP SIGNATURE-----
> _______________________________________________
> release-wranglers mailing list
> release-wranglers-PD4FTy7X32lNgt0PjOBp9y5qC8QIuHrW@public.gmane.org
> http://lists.freedesktop.org/mailman/listinfo/release-wranglers


-- 
	-Alan Coopersmith-           [email protected]
	 Sun Microsystems, Inc. - X Window System Engineering