Re: Feature suggestion: 2 times for "duration of task": optimistic and pessimistic
Mikael Hallendal <[email protected]>
| Newsgroups | gmane.comp.gnome.apps.mr-project.user |
|---|---|
| Message-ID | <[email protected]> |
sön 2002-08-18 klockan 23.15 skrev Richard Hult: > sön 2002-08-18 klockan 21.33 skrev info: > > Please dont overload the software by MsProject incompatible functions, > > really make them optional features (configureable in an option menu). Only > > when the feature is switched on, the menu items and features should be > > accessible and visible to the user. > > What do you mean by "incompatible functions"? Please give more specific > pointers. Yes, I have to admit that this confused me to. I'm not sure that just saying, "keep compatible with Microsoft Project" is a good thing. There are lots of other project management tools out there and I don't think we should give Microsoft Project any special treatment. > > To reach a Milestones it takes **one** person to take responsibility for the > > timing and resource of this milestone. > > Is has to be **taking** responsibility and not **assigned** responsibility > > by the boss. > > Since MrProject is a single user program, without a project > central/multiuser version, assigning/taking responsibility has to be > done by ONE person. Nothing stops that person from asking the people > he's working with if they are willing to do this and that etc. > I don't see your point really, but perhaps what you mean is that we need > a multiuser setup. That's probably something that we'll end up > implementing in the future, if we have the time to do it. Not in the > near future though. It should be added that it _currently_ is a single user program. And version 1.0 will still be a single user tool. That doesn't mean we will never look into doing this. Regards, Mikael Hallendal -- Mikael Hallendal [email protected] CodeFactory AB http://www.codefactory.se/ Office: +46 (0)8 587 583 05 Cell: +46 (0)709 718 918