Planner-list sharing or exclusive usage of resources
Joachim Fehn <Joachim.Fehn-/ixSogHR0HOS/[email protected]>
| Newsgroups | gmane.comp.gnome.apps.planner.user |
|---|---|
| Organization | fsc ip sw os 6 |
| Message-ID | <[email protected]> |
Hi, I'm planning a project with the great planner tool. But I'm confused by the way, resources are handled. I defined resources, especially a team named OS6 (type work) and tasks. The tasks named Server and Authentication require the resource OS6 by 100% each. I mean, the two tasks should be one after the other, because the team can do only one job at a time: 1st Server (prio 8), then Athentication (prio 4). planner puts the two tasks into the same time slice an produces a resource usage of 200%. How can I get it working? (planner 0.14.2 on openSuse 10.3) BTW: Is there an online manual? I didn't find one with the distribution nor at gnome.org. Thanx, Regards Joachim Fehn -- Joachim Fehn Senior Expert Developer -- IP SW OS 6 Fujitsu Siemens Computers GmbH www.fujitsu-siemens.de Otto-Hahn-Ring 6 www.fujitsu-siemens.de/imprint.html D-81739 Muenchen Joachim.Fehn-/ixSogHR0HOS/[email protected]