Controlling what the progress is in the buildstatus file
Adam Bruss <[email protected]> Mon, 7 May 2012 14:39:27 +0000
| Newsgroups | gmane.comp.java.cruise-control.user |
|---|---|
| Message-ID | <[email protected]> |
Hello, Is there a direct way from inside an ant task to control the progress message in the buildstatus file? I think by default it grabs the name of the last ant target to start. This is less than ideal for me. Can I echo a message with a specific token in the string and have the buildstatus file pick it up? -Adam Adam Bruss Senior Development Engineer AWR Corporation 11520 N. Port Washington Rd., Suite 201 Mequon, WI 53092 USA P: 1.262.240.0291 x104 F: 1.262.240.0294 E: [email protected] W: http://www.awrcorp.com<http://www.awrcorp.com/> ------------------------------------------------------------------------------ Live Security Virtual Conference Exclusive live event will cover all the ways today's security and threat landscape has changed and how IT managers can respond. Discussions will include endpoint security, mobile security and the latest in malware threats. http://www.accelacomm.com/jaw/sfrnl04242012/114/50122263/ _______________________________________________ Cruisecontrol-user mailing list [email protected] https://lists.sourceforge.net/lists/listinfo/cruisecontrol-user