Re: Classpath merge progress?

"Grzegorz B. Prokopski" <[email protected]> Wed, 23 Feb 2005 03:24:13 -0500
Newsgroups gmane.comp.java.vm.sablevm.devel
Organization SableVM - LGPL'ed Free Java VM http://sablevm.org
Message-ID <[email protected]>
On Tue, 2005-22-02 at 11:40 -0500, Etienne Gagnon wrote:
> Hi Greg and David,
> 
> I know you have been working on the merge.  What's the status?  What are 
> the problems that are delaying the merge into staging?

Done, but apparently we have some serious performance regression.
Elipse startup seemed terribly long to me, almost as if I were running
a debug version and not one with the inline engine.

In particular we should implement natively getCallingClass and
getClassLoader from VMStackWalker (and please don't wait with this for
me).  If this doesn't help we'll need to look further.  

[ BTW: I'd like to see the release in next days, right after the ]
[ release of GNU CP 0.14 which AFAIK is to happen RSN.             ]

Besides this performance problem, do we have any other showstoppers
for 1.1.10 release?

				Grzegorz B. Prokopski
-- 
Grzegorz B. Prokopski           <[email protected]>
SableVM - Free, LGPL'ed Java VM  http://sablevm.org
Why SableVM ?!?                  http://sablevm.org/wiki/Features
Debian GNU/Linux - the Free OS   http://www.debian.org