still errors with k3b and DVD-RWs

jagerhans <[email protected]> Fri, 20 Nov 2009 21:18:14 +0100
Newsgroups gmane.comp.kde.k3b
Message-ID <[email protected]>
This is a multi-part message in MIME format.
--===============8041535001298099355==
Content-Type: multipart/alternative;
	boundary="------------070808050804060406020308"

This is a multi-part message in MIME format.
--------------070808050804060406020308
Content-Type: text/plain; charset=ISO-8859-15; format=flowed
Content-Transfer-Encoding: 7bit

hello, still fighting with this messy k3b -growisofs. basically, you just can't append a new session to a DVD-RW .
every time at the end of the write process k3b exits with errors
//
/dev/sr0:XXXX doesn't look like isofs

//*
here the output*//


System
-----------------------
K3b Version: 1.0.5

KDE Version: 3.5.10
QT Version:  3.3.8b
Kernel:      2.6.31-15-generic
Devices
-----------------------
HL-DT-ST DVDRAM GH22NS40 NL00 (/dev/sr0, /dev/sg1) [CD-R, CD-RW, CD-ROM, DVD-ROM, DVD-R, DVD-RW, DVD-R DL, DVD+R, DVD+RW, DVD+R DL] [DVD-ROM, DVD-R sequenziale, DVD-R sequenziale a doppio strato, DVD-R jump a doppio strato, DVD-RAM, DVD-RW a riscrittura limitata, DVD-RW sequenziale, DVD+RW, DVD+R, DVD+R a doppio strato, CD-ROM, CD-R, CD-RW] [SAO, TAO, RAW, SAO/R96P, SAO/R96R, RAW/R96R, Riscrittura limitata, Livello Jump]

Burned media
-----------------------
DVD-RW a riscrittura limitata

K3bIsoImager
-----------------------
mkisofs print size result: 89940 (184197120 bytes)
Pipe throughput: 184197185 bytes read, 184197185 bytes written.

Used versions
-----------------------
mkisofs: 2.1.1a67
growisofs: 7.1

growisofs
-----------------------
Executing 'builtin_dd if=/dev/fd/0 of=/dev/sr0 obs=32k seek=44699'
/dev/sr0: "Current Write Speed" is 6.1x1352KBps.
 1464696832/1648893952 ( 0.0%) @0x, remaining ??:?? RBU  17.2% UBU   0.0%
 1474035712/1648893952 ( 5.1%) @2.0x, remaining 2:29 RBU  16.3% UBU   2.9%
 1501757440/1648893952 (20.1%) @6.0x, remaining 0:43 RBU  13.7% UBU 100.0%
 1529479168/1648893952 (35.2%) @6.0x, remaining 0:27 RBU  11.1% UBU 100.0%
 1557233664/1648893952 (50.2%) @6.0x, remaining 0:17 RBU   8.5% UBU  94.1%
 1584955392/1648893952 (65.3%) @6.0x, remaining 0:11 RBU   6.0% UBU 100.0%
 1612677120/1648893952 (80.3%) @6.0x, remaining 0:06 RBU   3.4% UBU 100.0%
 1640398848/1648893952 (95.4%) @6.0x, remaining 0:01 RBU   0.8% UBU 100.0%
/dev/sr0: flushing cache
:-( /dev/sr0:715184 doesn't look like isofs!

growisofs command:
-----------------------
/usr/bin/growisofs -C 16,715184 -M /dev/sr0=/dev/fd/0 -use-the-force-luke=notray -use-the-force-luke=tty -use-the-force-luke=tracksize:89940 -speed=6 -overburn -use-the-force-luke=bufsize:1024m 

mkisofs
-----------------------
/opt/schily/bin/mkisofs: Warning: Cannot add inode hints with -no-cache-inodes.
/opt/schily/bin/mkisofs: Warning: Cannot add inode hints with -no-cache-inodes.
SUSP signatures version 1 found
SUSP signatures version 1 found
Rock Ridge signatures version 1 found
Rock Ridge id 'RRIP_1991A'
89940
/opt/schily/bin/mkisofs: Warning: Cannot add inode hints with -no-cache-inodes.
Setting input-charset to 'UTF-8' from locale.
SUSP signatures version 1 found
 88.87% done, estimate finish Fri Nov 20 20:05:07 2009
 88.93% done, estimate finish Fri Nov 20 20:05:07 2009
 88.99% done, estimate finish Fri Nov 20 20:05:07 2009
 89.05% done, estimate finish Fri Nov 20 20:05:07 2009
 89.12% done, estimate finish Fri Nov 20 20:05:07 2009
 89.18% done, estimate finish Fri Nov 20 20:05:07 2009
 89.24% done, estimate finish Fri Nov 20 20:05:07 2009
 89.30% done, estimate finish Fri Nov 20 20:05:07 2009
 89.37% done, estimate finish Fri Nov 20 20:05:07 2009
 89.43% done, estimate finish Fri Nov 20 20:05:07 2009
 89.49% done, estimate finish Fri Nov 20 20:05:07 2009
 89.55% done, estimate finish Fri Nov 20 20:05:07 2009
 89.62% done, estimate finish Fri Nov 20 20:05:07 2009
 89.68% done, estimate finish Fri Nov 20 20:05:07 2009
 89.74% done, estimate finish Fri Nov 20 20:05:07 2009
 89.80% done, estimate finish Fri Nov 20 20:05:07 2009
 89.86% done, estimate finish Fri Nov 20 20:05:07 2009
 89.93% done, estimate finish Fri Nov 20 20:05:07 2009
 89.99% done, estimate finish Fri Nov 20 20:05:07 2009
 90.05% done, estimate finish Fri Nov 20 20:05:07 2009
 90.11% done, estimate finish Fri Nov 20 20:05:07 2009
 90.17% done, estimate finish Fri Nov 20 20:05:07 2009
 90.24% done, estimate finish Fri Nov 20 20:05:07 2009
 90.30% done, estimate finish Fri Nov 20 20:05:07 2009
 90.36% done, estimate finish Fri Nov 20 20:05:07 2009
 90.42% done, estimate finish Fri Nov 20 20:05:07 2009
 90.48% done, estimate finish Fri Nov 20 20:05:07 2009
 90.55% done, estimate finish Fri Nov 20 20:05:07 2009
 90.61% done, estimate finish Fri Nov 20 20:05:07 2009
 90.67% done, estimate finish Fri Nov 20 20:05:07 2009
 90.73% done, estimate finish Fri Nov 20 20:05:07 2009
 90.79% done, estimate finish Fri Nov 20 20:05:07 2009
 90.86% done, estimate finish Fri Nov 20 20:05:07 2009
 90.92% done, estimate finish Fri Nov 20 20:05:07 2009
 90.98% done, estimate finish Fri Nov 20 20:05:07 2009
 91.04% done, estimate finish Fri Nov 20 20:05:07 2009
 91.11% done, estimate finish Fri Nov 20 20:05:07 2009
 91.17% done, estimate finish Fri Nov 20 20:05:07 2009
 91.23% done, estimate finish Fri Nov 20 20:05:07 2009
 91.29% done, estimate finish Fri Nov 20 20:05:07 2009
 91.35% done, estimate finish Fri Nov 20 20:05:07 2009
 91.42% done, estimate finish Fri Nov 20 20:05:07 2009
 91.48% done, estimate finish Fri Nov 20 20:05:07 2009
 91.54% done, estimate finish Fri Nov 20 20:05:07 2009
 91.60% done, estimate finish Fri Nov 20 20:05:07 2009
 91.66% done, estimate finish Fri Nov 20 20:05:07 2009
 91.73% done, estimate finish Fri Nov 20 20:05:07 2009
 91.79% done, estimate finish Fri Nov 20 20:05:07 2009
 91.85% done, estimate finish Fri Nov 20 20:05:07 2009
 91.91% done, estimate finish Fri Nov 20 20:05:07 2009
 91.97% done, estimate finish Fri Nov 20 20:05:08 2009
 92.04% done, estimate finish Fri Nov 20 20:05:08 2009
 92.10% done, estimate finish Fri Nov 20 20:05:08 2009
 92.16% done, estimate finish Fri Nov 20 20:05:08 2009
 92.22% done, estimate finish Fri Nov 20 20:05:08 2009
 92.28% done, estimate finish Fri Nov 20 20:05:08 2009
 92.35% done, estimate finish Fri Nov 20 20:05:08 2009
 92.41% done, estimate finish Fri Nov 20 20:05:08 2009
 92.47% done, estimate finish Fri Nov 20 20:05:08 2009
 92.53% done, estimate finish Fri Nov 20 20:05:08 2009
 92.60% done, estimate finish Fri Nov 20 20:05:08 2009
 92.66% done, estimate finish Fri Nov 20 20:05:08 2009
 92.72% done, estimate finish Fri Nov 20 20:05:08 2009
 92.78% done, estimate finish Fri Nov 20 20:05:08 2009
 92.84% done, estimate finish Fri Nov 20 20:05:08 2009
 92.91% done, estimate finish Fri Nov 20 20:05:08 2009
 92.97% done, estimate finish Fri Nov 20 20:05:08 2009
 93.03% done, estimate finish Fri Nov 20 20:05:08 2009
 93.09% done, estimate finish Fri Nov 20 20:05:08 2009
 93.15% done, estimate finish Fri Nov 20 20:05:08 2009
 93.22% done, estimate finish Fri Nov 20 20:05:08 2009
 93.28% done, estimate finish Fri Nov 20 20:05:08 2009
 93.34% done, estimate finish Fri Nov 20 20:05:08 2009
 93.40% done, estimate finish Fri Nov 20 20:05:08 2009
 93.46% done, estimate finish Fri Nov 20 20:05:08 2009
 93.53% done, estimate finish Fri Nov 20 20:05:08 2009
 93.59% done, estimate finish Fri Nov 20 20:05:08 2009
 93.65% done, estimate finish Fri Nov 20 20:05:08 2009
 93.71% done, estimate finish Fri Nov 20 20:05:08 2009
 93.77% done, estimate finish Fri Nov 20 20:05:08 2009
 93.84% done, estimate finish Fri Nov 20 20:05:08 2009
 93.90% done, estimate finish Fri Nov 20 20:05:08 2009
 93.96% done, estimate finish Fri Nov 20 20:05:08 2009
 94.02% done, estimate finish Fri Nov 20 20:05:08 2009
 94.09% done, estimate finish Fri Nov 20 20:05:08 2009
 94.15% done, estimate finish Fri Nov 20 20:05:08 2009
 94.21% done, estimate finish Fri Nov 20 20:05:08 2009
 94.27% done, estimate finish Fri Nov 20 20:05:08 2009
 94.33% done, estimate finish Fri Nov 20 20:05:08 2009
 94.40% done, estimate finish Fri Nov 20 20:05:08 2009
 94.46% done, estimate finish Fri Nov 20 20:05:08 2009
 94.52% done, estimate finish Fri Nov 20 20:05:08 2009
 94.58% done, estimate finish Fri Nov 20 20:05:08 2009
 94.64% done, estimate finish Fri Nov 20 20:05:08 2009
 94.71% done, estimate finish Fri Nov 20 20:05:08 2009
 94.77% done, estimate finish Fri Nov 20 20:05:08 2009
 94.83% done, estimate finish Fri Nov 20 20:05:08 2009
 94.89% done, estimate finish Fri Nov 20 20:05:08 2009
 94.95% done, estimate finish Fri Nov 20 20:05:08 2009
 95.02% done, estimate finish Fri Nov 20 20:05:08 2009
 95.08% done, estimate finish Fri Nov 20 20:05:08 2009
 95.14% done, estimate finish Fri Nov 20 20:05:08 2009
 95.20% done, estimate finish Fri Nov 20 20:05:08 2009
 95.26% done, estimate finish Fri Nov 20 20:05:08 2009
 95.33% done, estimate finish Fri Nov 20 20:05:08 2009
 95.39% done, estimate finish Fri Nov 20 20:05:08 2009
 95.45% done, estimate finish Fri Nov 20 20:05:08 2009
 95.51% done, estimate finish Fri Nov 20 20:05:08 2009
 95.58% done, estimate finish Fri Nov 20 20:05:08 2009
 95.64% done, estimate finish Fri Nov 20 20:05:08 2009
 95.70% done, estimate finish Fri Nov 20 20:05:08 2009
 95.76% done, estimate finish Fri Nov 20 20:05:08 2009
 95.83% done, estimate finish Fri Nov 20 20:05:08 2009
 95.89% done, estimate finish Fri Nov 20 20:05:08 2009
 95.95% done, estimate finish Fri Nov 20 20:05:08 2009
 96.01% done, estimate finish Fri Nov 20 20:05:08 2009
 96.07% done, estimate finish Fri Nov 20 20:05:08 2009
 96.14% done, estimate finish Fri Nov 20 20:05:08 2009
 96.20% done, estimate finish Fri Nov 20 20:05:08 2009
 96.26% done, estimate finish Fri Nov 20 20:05:08 2009
 96.32% done, estimate finish Fri Nov 20 20:05:08 2009
 96.38% done, estimate finish Fri Nov 20 20:05:08 2009
 96.45% done, estimate finish Fri Nov 20 20:05:08 2009
 96.51% done, estimate finish Fri Nov 20 20:05:08 2009
 96.57% done, estimate finish Fri Nov 20 20:05:08 2009
 96.63% done, estimate finish Fri Nov 20 20:05:08 2009
 96.69% done, estimate finish Fri Nov 20 20:05:08 2009
 96.76% done, estimate finish Fri Nov 20 20:05:08 2009
 96.82% done, estimate finish Fri Nov 20 20:05:08 2009
 96.88% done, estimate finish Fri Nov 20 20:05:08 2009
 96.94% done, estimate finish Fri Nov 20 20:05:08 2009
 97.00% done, estimate finish Fri Nov 20 20:05:08 2009
 97.07% done, estimate finish Fri Nov 20 20:05:08 2009
 97.13% done, estimate finish Fri Nov 20 20:05:08 2009
 97.19% done, estimate finish Fri Nov 20 20:05:08 2009
 97.25% done, estimate finish Fri Nov 20 20:05:08 2009
 97.32% done, estimate finish Fri Nov 20 20:05:08 2009
 97.38% done, estimate finish Fri Nov 20 20:05:08 2009
 97.44% done, estimate finish Fri Nov 20 20:05:08 2009
 97.50% done, estimate finish Fri Nov 20 20:05:08 2009
 97.56% done, estimate finish Fri Nov 20 20:05:08 2009
 97.63% done, estimate finish Fri Nov 20 20:05:08 2009
 97.69% done, estimate finish Fri Nov 20 20:05:08 2009
 97.75% done, estimate finish Fri Nov 20 20:05:08 2009
 97.81% done, estimate finish Fri Nov 20 20:05:08 2009
 97.87% done, estimate finish Fri Nov 20 20:05:08 2009
 97.94% done, estimate finish Fri Nov 20 20:05:08 2009
 98.00% done, estimate finish Fri Nov 20 20:05:08 2009
 98.06% done, estimate finish Fri Nov 20 20:05:08 2009
 98.12% done, estimate finish Fri Nov 20 20:05:08 2009
 98.18% done, estimate finish Fri Nov 20 20:05:08 2009
 98.25% done, estimate finish Fri Nov 20 20:05:08 2009
 98.31% done, estimate finish Fri Nov 20 20:05:08 2009
 98.37% done, estimate finish Fri Nov 20 20:05:08 2009
 98.43% done, estimate finish Fri Nov 20 20:05:08 2009
 98.49% done, estimate finish Fri Nov 20 20:05:08 2009
 98.56% done, estimate finish Fri Nov 20 20:05:08 2009
 98.62% done, estimate finish Fri Nov 20 20:05:08 2009
 98.68% done, estimate finish Fri Nov 20 20:05:08 2009
 98.74% done, estimate finish Fri Nov 20 20:05:08 2009
 98.81% done, estimate finish Fri Nov 20 20:05:08 2009
 98.87% done, estimate finish Fri Nov 20 20:05:08 2009
 98.93% done, estimate finish Fri Nov 20 20:05:08 2009
 98.99% done, estimate finish Fri Nov 20 20:05:08 2009
 99.05% done, estimate finish Fri Nov 20 20:05:08 2009
 99.12% done, estimate finish Fri Nov 20 20:05:08 2009
 99.18% done, estimate finish Fri Nov 20 20:05:09 2009
 99.24% done, estimate finish Fri Nov 20 20:05:09 2009
 99.30% done, estimate finish Fri Nov 20 20:05:09 2009
 99.36% done, estimate finish Fri Nov 20 20:05:09 2009
 99.43% done, estimate finish Fri Nov 20 20:05:09 2009
 99.49% done, estimate finish Fri Nov 20 20:05:09 2009
 99.55% done, estimate finish Fri Nov 20 20:05:09 2009
 99.61% done, estimate finish Fri Nov 20 20:05:09 2009
 99.67% done, estimate finish Fri Nov 20 20:05:09 2009
 99.74% done, estimate finish Fri Nov 20 20:05:09 2009
 99.80% done, estimate finish Fri Nov 20 20:05:09 2009
 99.86% done, estimate finish Fri Nov 20 20:05:09 2009
 99.92% done, estimate finish Fri Nov 20 20:05:09 2009
Total translation table size: 0
Total rockridge attributes bytes: 573
Total directory bytes: 878
Path table size(bytes): 10
Max brk space used 0
89940 extents written (175 MB)

mkisofs calculate size command:
-----------------------
/opt/schily/bin/mkisofs -cdrecord-params 16,715184 -prev-session /dev/sr0 -gui -graft-points -print-size -quiet -volid Le Viol Du Vampire - Jean Rollin -volset  -appid K3B THE CD KREATOR (C) 1998-2006 SEBASTIAN TRUEG AND THE K3B TEAM -publisher  -preparer  -sysid LINUX -volset-size 1 -volset-seqno 1 -sort /tmp/kde-user/k3bnXOoVa.tmp -rational-rock -hide-list /tmp/kde-user/k3bxBoJnc.tmp -no-cache-inodes -full-iso9660-filenames -iso-level 2 -path-list /tmp/kde-user/k3bIOE75b.tmp 

mkisofs command:
-----------------------
/opt/schily/bin/mkisofs -cdrecord-params 16,715184 -prev-session /dev/sr0 -gui -graft-points -volid Le Viol Du Vampire - Jean Rollin -volset  -appid K3B THE CD KREATOR (C) 1998-2006 SEBASTIAN TRUEG AND THE K3B TEAM -publisher  -preparer  -sysid LINUX -volset-size 1 -volset-seqno 1 -sort /tmp/kde-user/k3bEzKwYb.tmp -rational-rock -hide-list /tmp/kde-user/k3buJORxa.tmp -no-cache-inodes -full-iso9660-filenames -iso-level 2 -path-list /tmp/kde-xxxxxxxxxx/xxxxxxxxx.tmp 
//


--------------070808050804060406020308
Content-Type: text/html; charset=ISO-8859-15
Content-Transfer-Encoding: 7bit

<!DOCTYPE html PUBLIC "-//W3C//DTD HTML 4.01 Transitional//EN">
<html>
<head>
</head>
<body bgcolor="#ffffff" text="#000000">
<pre>hello, still fighting with this messy k3b -growisofs. basically, you just can't append a new session to a DVD-RW .
every time at the end of the write process k3b exits with errors
<i><i>
/dev/sr0:XXXX doesn't look like isofs

</i></i><b>
here the output</b><i><i>


System
-----------------------
K3b Version: 1.0.5

KDE Version: 3.5.10
QT Version:  3.3.8b
Kernel:      2.6.31-15-generic
Devices
-----------------------
HL-DT-ST DVDRAM GH22NS40 NL00 (/dev/sr0, /dev/sg1) [CD-R, CD-RW, CD-ROM, DVD-ROM, DVD-R, DVD-RW, DVD-R DL, DVD+R, DVD+RW, DVD+R DL] [DVD-ROM, DVD-R sequenziale, DVD-R sequenziale a doppio strato, DVD-R jump a doppio strato, DVD-RAM, DVD-RW a riscrittura limitata, DVD-RW sequenziale, DVD+RW, DVD+R, DVD+R a doppio strato, CD-ROM, CD-R, CD-RW] [SAO, TAO, RAW, SAO/R96P, SAO/R96R, RAW/R96R, Riscrittura limitata, Livello Jump]

Burned media
-----------------------
DVD-RW a riscrittura limitata

K3bIsoImager
-----------------------
mkisofs print size result: 89940 (184197120 bytes)
Pipe throughput: 184197185 bytes read, 184197185 bytes written.

Used versions
-----------------------
mkisofs: 2.1.1a67
growisofs: 7.1

growisofs
-----------------------
Executing 'builtin_dd if=/dev/fd/0 of=/dev/sr0 obs=32k seek=44699'
/dev/sr0: "Current Write Speed" is 6.1x1352KBps.
 1464696832/1648893952 ( 0.0%) @0x, remaining ??:?? RBU  17.2% UBU   0.0%
 1474035712/1648893952 ( 5.1%) @2.0x, remaining 2:29 RBU  16.3% UBU   2.9%
 1501757440/1648893952 (20.1%) @6.0x, remaining 0:43 RBU  13.7% UBU 100.0%
 1529479168/1648893952 (35.2%) @6.0x, remaining 0:27 RBU  11.1% UBU 100.0%
 1557233664/1648893952 (50.2%) @6.0x, remaining 0:17 RBU   8.5% UBU  94.1%
 1584955392/1648893952 (65.3%) @6.0x, remaining 0:11 RBU   6.0% UBU 100.0%
 1612677120/1648893952 (80.3%) @6.0x, remaining 0:06 RBU   3.4% UBU 100.0%
 1640398848/1648893952 (95.4%) @6.0x, remaining 0:01 RBU   0.8% UBU 100.0%
/dev/sr0: flushing cache
:-( /dev/sr0:715184 doesn't look like isofs!

growisofs command:
-----------------------
/usr/bin/growisofs -C 16,715184 -M /dev/sr0=/dev/fd/0 -use-the-force-luke=notray -use-the-force-luke=tty -use-the-force-luke=tracksize:89940 -speed=6 -overburn -use-the-force-luke=bufsize:1024m 

mkisofs
-----------------------
/opt/schily/bin/mkisofs: Warning: Cannot add inode hints with -no-cache-inodes.
/opt/schily/bin/mkisofs: Warning: Cannot add inode hints with -no-cache-inodes.
SUSP signatures version 1 found
SUSP signatures version 1 found
Rock Ridge signatures version 1 found
Rock Ridge id 'RRIP_1991A'
89940
/opt/schily/bin/mkisofs: Warning: Cannot add inode hints with -no-cache-inodes.
Setting input-charset to 'UTF-8' from locale.
SUSP signatures version 1 found
 88.87% done, estimate finish Fri Nov 20 20:05:07 2009
 88.93% done, estimate finish Fri Nov 20 20:05:07 2009
 88.99% done, estimate finish Fri Nov 20 20:05:07 2009
 89.05% done, estimate finish Fri Nov 20 20:05:07 2009
 89.12% done, estimate finish Fri Nov 20 20:05:07 2009
 89.18% done, estimate finish Fri Nov 20 20:05:07 2009
 89.24% done, estimate finish Fri Nov 20 20:05:07 2009
 89.30% done, estimate finish Fri Nov 20 20:05:07 2009
 89.37% done, estimate finish Fri Nov 20 20:05:07 2009
 89.43% done, estimate finish Fri Nov 20 20:05:07 2009
 89.49% done, estimate finish Fri Nov 20 20:05:07 2009
 89.55% done, estimate finish Fri Nov 20 20:05:07 2009
 89.62% done, estimate finish Fri Nov 20 20:05:07 2009
 89.68% done, estimate finish Fri Nov 20 20:05:07 2009
 89.74% done, estimate finish Fri Nov 20 20:05:07 2009
 89.80% done, estimate finish Fri Nov 20 20:05:07 2009
 89.86% done, estimate finish Fri Nov 20 20:05:07 2009
 89.93% done, estimate finish Fri Nov 20 20:05:07 2009
 89.99% done, estimate finish Fri Nov 20 20:05:07 2009
 90.05% done, estimate finish Fri Nov 20 20:05:07 2009
 90.11% done, estimate finish Fri Nov 20 20:05:07 2009
 90.17% done, estimate finish Fri Nov 20 20:05:07 2009
 90.24% done, estimate finish Fri Nov 20 20:05:07 2009
 90.30% done, estimate finish Fri Nov 20 20:05:07 2009
 90.36% done, estimate finish Fri Nov 20 20:05:07 2009
 90.42% done, estimate finish Fri Nov 20 20:05:07 2009
 90.48% done, estimate finish Fri Nov 20 20:05:07 2009
 90.55% done, estimate finish Fri Nov 20 20:05:07 2009
 90.61% done, estimate finish Fri Nov 20 20:05:07 2009
 90.67% done, estimate finish Fri Nov 20 20:05:07 2009
 90.73% done, estimate finish Fri Nov 20 20:05:07 2009
 90.79% done, estimate finish Fri Nov 20 20:05:07 2009
 90.86% done, estimate finish Fri Nov 20 20:05:07 2009
 90.92% done, estimate finish Fri Nov 20 20:05:07 2009
 90.98% done, estimate finish Fri Nov 20 20:05:07 2009
 91.04% done, estimate finish Fri Nov 20 20:05:07 2009
 91.11% done, estimate finish Fri Nov 20 20:05:07 2009
 91.17% done, estimate finish Fri Nov 20 20:05:07 2009
 91.23% done, estimate finish Fri Nov 20 20:05:07 2009
 91.29% done, estimate finish Fri Nov 20 20:05:07 2009
 91.35% done, estimate finish Fri Nov 20 20:05:07 2009
 91.42% done, estimate finish Fri Nov 20 20:05:07 2009
 91.48% done, estimate finish Fri Nov 20 20:05:07 2009
 91.54% done, estimate finish Fri Nov 20 20:05:07 2009
 91.60% done, estimate finish Fri Nov 20 20:05:07 2009
 91.66% done, estimate finish Fri Nov 20 20:05:07 2009
 91.73% done, estimate finish Fri Nov 20 20:05:07 2009
 91.79% done, estimate finish Fri Nov 20 20:05:07 2009
 91.85% done, estimate finish Fri Nov 20 20:05:07 2009
 91.91% done, estimate finish Fri Nov 20 20:05:07 2009
 91.97% done, estimate finish Fri Nov 20 20:05:08 2009
 92.04% done, estimate finish Fri Nov 20 20:05:08 2009
 92.10% done, estimate finish Fri Nov 20 20:05:08 2009
 92.16% done, estimate finish Fri Nov 20 20:05:08 2009
 92.22% done, estimate finish Fri Nov 20 20:05:08 2009
 92.28% done, estimate finish Fri Nov 20 20:05:08 2009
 92.35% done, estimate finish Fri Nov 20 20:05:08 2009
 92.41% done, estimate finish Fri Nov 20 20:05:08 2009
 92.47% done, estimate finish Fri Nov 20 20:05:08 2009
 92.53% done, estimate finish Fri Nov 20 20:05:08 2009
 92.60% done, estimate finish Fri Nov 20 20:05:08 2009
 92.66% done, estimate finish Fri Nov 20 20:05:08 2009
 92.72% done, estimate finish Fri Nov 20 20:05:08 2009
 92.78% done, estimate finish Fri Nov 20 20:05:08 2009
 92.84% done, estimate finish Fri Nov 20 20:05:08 2009
 92.91% done, estimate finish Fri Nov 20 20:05:08 2009
 92.97% done, estimate finish Fri Nov 20 20:05:08 2009
 93.03% done, estimate finish Fri Nov 20 20:05:08 2009
 93.09% done, estimate finish Fri Nov 20 20:05:08 2009
 93.15% done, estimate finish Fri Nov 20 20:05:08 2009
 93.22% done, estimate finish Fri Nov 20 20:05:08 2009
 93.28% done, estimate finish Fri Nov 20 20:05:08 2009
 93.34% done, estimate finish Fri Nov 20 20:05:08 2009
 93.40% done, estimate finish Fri Nov 20 20:05:08 2009
 93.46% done, estimate finish Fri Nov 20 20:05:08 2009
 93.53% done, estimate finish Fri Nov 20 20:05:08 2009
 93.59% done, estimate finish Fri Nov 20 20:05:08 2009
 93.65% done, estimate finish Fri Nov 20 20:05:08 2009
 93.71% done, estimate finish Fri Nov 20 20:05:08 2009
 93.77% done, estimate finish Fri Nov 20 20:05:08 2009
 93.84% done, estimate finish Fri Nov 20 20:05:08 2009
 93.90% done, estimate finish Fri Nov 20 20:05:08 2009
 93.96% done, estimate finish Fri Nov 20 20:05:08 2009
 94.02% done, estimate finish Fri Nov 20 20:05:08 2009
 94.09% done, estimate finish Fri Nov 20 20:05:08 2009
 94.15% done, estimate finish Fri Nov 20 20:05:08 2009
 94.21% done, estimate finish Fri Nov 20 20:05:08 2009
 94.27% done, estimate finish Fri Nov 20 20:05:08 2009
 94.33% done, estimate finish Fri Nov 20 20:05:08 2009
 94.40% done, estimate finish Fri Nov 20 20:05:08 2009
 94.46% done, estimate finish Fri Nov 20 20:05:08 2009
 94.52% done, estimate finish Fri Nov 20 20:05:08 2009
 94.58% done, estimate finish Fri Nov 20 20:05:08 2009
 94.64% done, estimate finish Fri Nov 20 20:05:08 2009
 94.71% done, estimate finish Fri Nov 20 20:05:08 2009
 94.77% done, estimate finish Fri Nov 20 20:05:08 2009
 94.83% done, estimate finish Fri Nov 20 20:05:08 2009
 94.89% done, estimate finish Fri Nov 20 20:05:08 2009
 94.95% done, estimate finish Fri Nov 20 20:05:08 2009
 95.02% done, estimate finish Fri Nov 20 20:05:08 2009
 95.08% done, estimate finish Fri Nov 20 20:05:08 2009
 95.14% done, estimate finish Fri Nov 20 20:05:08 2009
 95.20% done, estimate finish Fri Nov 20 20:05:08 2009
 95.26% done, estimate finish Fri Nov 20 20:05:08 2009
 95.33% done, estimate finish Fri Nov 20 20:05:08 2009
 95.39% done, estimate finish Fri Nov 20 20:05:08 2009
 95.45% done, estimate finish Fri Nov 20 20:05:08 2009
 95.51% done, estimate finish Fri Nov 20 20:05:08 2009
 95.58% done, estimate finish Fri Nov 20 20:05:08 2009
 95.64% done, estimate finish Fri Nov 20 20:05:08 2009
 95.70% done, estimate finish Fri Nov 20 20:05:08 2009
 95.76% done, estimate finish Fri Nov 20 20:05:08 2009
 95.83% done, estimate finish Fri Nov 20 20:05:08 2009
 95.89% done, estimate finish Fri Nov 20 20:05:08 2009
 95.95% done, estimate finish Fri Nov 20 20:05:08 2009
 96.01% done, estimate finish Fri Nov 20 20:05:08 2009
 96.07% done, estimate finish Fri Nov 20 20:05:08 2009
 96.14% done, estimate finish Fri Nov 20 20:05:08 2009
 96.20% done, estimate finish Fri Nov 20 20:05:08 2009
 96.26% done, estimate finish Fri Nov 20 20:05:08 2009
 96.32% done, estimate finish Fri Nov 20 20:05:08 2009
 96.38% done, estimate finish Fri Nov 20 20:05:08 2009
 96.45% done, estimate finish Fri Nov 20 20:05:08 2009
 96.51% done, estimate finish Fri Nov 20 20:05:08 2009
 96.57% done, estimate finish Fri Nov 20 20:05:08 2009
 96.63% done, estimate finish Fri Nov 20 20:05:08 2009
 96.69% done, estimate finish Fri Nov 20 20:05:08 2009
 96.76% done, estimate finish Fri Nov 20 20:05:08 2009
 96.82% done, estimate finish Fri Nov 20 20:05:08 2009
 96.88% done, estimate finish Fri Nov 20 20:05:08 2009
 96.94% done, estimate finish Fri Nov 20 20:05:08 2009
 97.00% done, estimate finish Fri Nov 20 20:05:08 2009
 97.07% done, estimate finish Fri Nov 20 20:05:08 2009
 97.13% done, estimate finish Fri Nov 20 20:05:08 2009
 97.19% done, estimate finish Fri Nov 20 20:05:08 2009
 97.25% done, estimate finish Fri Nov 20 20:05:08 2009
 97.32% done, estimate finish Fri Nov 20 20:05:08 2009
 97.38% done, estimate finish Fri Nov 20 20:05:08 2009
 97.44% done, estimate finish Fri Nov 20 20:05:08 2009
 97.50% done, estimate finish Fri Nov 20 20:05:08 2009
 97.56% done, estimate finish Fri Nov 20 20:05:08 2009
 97.63% done, estimate finish Fri Nov 20 20:05:08 2009
 97.69% done, estimate finish Fri Nov 20 20:05:08 2009
 97.75% done, estimate finish Fri Nov 20 20:05:08 2009
 97.81% done, estimate finish Fri Nov 20 20:05:08 2009
 97.87% done, estimate finish Fri Nov 20 20:05:08 2009
 97.94% done, estimate finish Fri Nov 20 20:05:08 2009
 98.00% done, estimate finish Fri Nov 20 20:05:08 2009
 98.06% done, estimate finish Fri Nov 20 20:05:08 2009
 98.12% done, estimate finish Fri Nov 20 20:05:08 2009
 98.18% done, estimate finish Fri Nov 20 20:05:08 2009
 98.25% done, estimate finish Fri Nov 20 20:05:08 2009
 98.31% done, estimate finish Fri Nov 20 20:05:08 2009
 98.37% done, estimate finish Fri Nov 20 20:05:08 2009
 98.43% done, estimate finish Fri Nov 20 20:05:08 2009
 98.49% done, estimate finish Fri Nov 20 20:05:08 2009
 98.56% done, estimate finish Fri Nov 20 20:05:08 2009
 98.62% done, estimate finish Fri Nov 20 20:05:08 2009
 98.68% done, estimate finish Fri Nov 20 20:05:08 2009
 98.74% done, estimate finish Fri Nov 20 20:05:08 2009
 98.81% done, estimate finish Fri Nov 20 20:05:08 2009
 98.87% done, estimate finish Fri Nov 20 20:05:08 2009
 98.93% done, estimate finish Fri Nov 20 20:05:08 2009
 98.99% done, estimate finish Fri Nov 20 20:05:08 2009
 99.05% done, estimate finish Fri Nov 20 20:05:08 2009
 99.12% done, estimate finish Fri Nov 20 20:05:08 2009
 99.18% done, estimate finish Fri Nov 20 20:05:09 2009
 99.24% done, estimate finish Fri Nov 20 20:05:09 2009
 99.30% done, estimate finish Fri Nov 20 20:05:09 2009
 99.36% done, estimate finish Fri Nov 20 20:05:09 2009
 99.43% done, estimate finish Fri Nov 20 20:05:09 2009
 99.49% done, estimate finish Fri Nov 20 20:05:09 2009
 99.55% done, estimate finish Fri Nov 20 20:05:09 2009
 99.61% done, estimate finish Fri Nov 20 20:05:09 2009
 99.67% done, estimate finish Fri Nov 20 20:05:09 2009
 99.74% done, estimate finish Fri Nov 20 20:05:09 2009
 99.80% done, estimate finish Fri Nov 20 20:05:09 2009
 99.86% done, estimate finish Fri Nov 20 20:05:09 2009
 99.92% done, estimate finish Fri Nov 20 20:05:09 2009
Total translation table size: 0
Total rockridge attributes bytes: 573
Total directory bytes: 878
Path table size(bytes): 10
Max brk space used 0
89940 extents written (175 MB)

mkisofs calculate size command:
-----------------------
/opt/schily/bin/mkisofs -cdrecord-params 16,715184 -prev-session /dev/sr0 -gui -graft-points -print-size -quiet -volid Le Viol Du Vampire - Jean Rollin -volset  -appid K3B THE CD KREATOR (C) 1998-2006 SEBASTIAN TRUEG AND THE K3B TEAM -publisher  -preparer  -sysid LINUX -volset-size 1 -volset-seqno 1 -sort /tmp/kde-user/k3bnXOoVa.tmp -rational-rock -hide-list /tmp/kde-user/k3bxBoJnc.tmp -no-cache-inodes -full-iso9660-filenames -iso-level 2 -path-list /tmp/kde-user/k3bIOE75b.tmp 

mkisofs command:
-----------------------
/opt/schily/bin/mkisofs -cdrecord-params 16,715184 -prev-session /dev/sr0 -gui -graft-points -volid Le Viol Du Vampire - Jean Rollin -volset  -appid K3B THE CD KREATOR (C) 1998-2006 SEBASTIAN TRUEG AND THE K3B TEAM -publisher  -preparer  -sysid LINUX -volset-size 1 -volset-seqno 1 -sort /tmp/kde-user/k3bEzKwYb.tmp -rational-rock -hide-list /tmp/kde-user/k3buJORxa.tmp -no-cache-inodes -full-iso9660-filenames -iso-level 2 -path-list /tmp/kde-xxxxxxxxxx/xxxxxxxxx.tmp 
</i></i></pre>
</body>
</html>

--------------070808050804060406020308--


--===============8041535001298099355==
Content-Type: text/plain; charset="us-ascii"
MIME-Version: 1.0
Content-Transfer-Encoding: 7bit
Content-Disposition: inline

------------------------------------------------------------------------------
Let Crystal Reports handle the reporting - Free Crystal Reports 2008 30-Day 
trial. Simplify your report design, integration and deployment - and focus on 
what you do best, core application coding. Discover what's new with
Crystal Reports now.  http://p.sf.net/sfu/bobj-july
--===============8041535001298099355==
Content-Type: text/plain; charset="us-ascii"
MIME-Version: 1.0
Content-Transfer-Encoding: 7bit
Content-Disposition: inline

_______________________________________________
K3b-user mailing list
[email protected]
https://lists.sourceforge.net/lists/listinfo/k3b-user

--===============8041535001298099355==--