On Thu, Oct 22, 2015 at 7:52 AM, Rohan D'Sa <[email protected]> wrote:
> Great answer, Wouter!
>
> Michael, I'd asked this question on the Scrum Alliance group a while back.
> Those answers might help you as well:
> https://groups.google.com/forum/m/#!searchin/scrumalliance/Sarbanes/scrumalliance/nHkaWNE1HQ0
>
> Groeten,
> Rohan
> On Oct 21, 2015 10:15 PM, "Wouter Lagerweij [email protected]
> [SCRUMDEVELOPMENT]" <[email protected]> wrote:
>
>>
>>
>> Hi Michael,
>>
>> I'm sure there's people here with more experience in this than I, but I
>> did work in a project at a large European insurance company where there was
>> a lot of focus on compliance and traceability. We had a number of sessions
>> with auditors about the process, and mostly they were very happy with what
>> happened in the scrum-ish-kanban-ish way of working.
>>
>> There were a couple of things that we did that were mentioned as being
>> important for us passing those audits:
>>
>> - The Definition of Done, as you said, was important to them. For us to
>> comply, we actually had the DoD as a real checklist, checked off and signed
>> by the Product Owner and, IIRC, at some point by one of the auditors (we
>> figured that if they wanted to audit the process, they'd better attend the
>> demo... :-) These signed DoDs were actually kept and archived as project
>> documentation.
>> - The test 'documentation': we used a BDD approach, with the outcomes of
>> conversations on requirements laid down in gherkin-style test scenarios.
>> This meant that for each 'requirement' (user story), we had a set of tests
>> linked. And since we automated those tests, we could show beyond doubt that
>> the requirement was actually implemented and tested. This was a huge hit
>> with the auditors, who came in expecting to have to slog through large sets
>> of 'test plan' spreadsheets, but ended up clicking through our generated
>> test-reports.
>> - A weekly (sprint-ly) report with the results of the sprint (just which
>> stories were done, mostly) was also needed as project documentation. Signed
>> by a scrum master, and the project/program manager in charge. We didn't do
>> anything with these documents, but again it was something that made the
>> auditors and surrounding company happy.
>>
>> This was, as you might deduce from these points, not the most agile
>> environment. But we worked with a group of about 60 people (6 teams and
>> 'overhead' like me), in weekly sprints, test driven, with a
>> pretty-continuous delivery set-up for about a year and with these kind of
>> measures exposed a more rigorous compliance than our formal caretakers had
>> been used to. They were a little reluctant in accepting an iterative
>> approach to the auditing at first, but that settled after a while.
>>
>> hth,
>>
>> Wouter
>>
>>
>> On Wed, Oct 21, 2015 at 9:21 PM, Michael Wollin [email protected]
>> [SCRUMDEVELOPMENT] <[email protected]> wrote:
>>
>>>
>>>
>>> Hi all,
>>>
>>> Where I am coaching, there is a powerful and persistent worry and
>>> preoccupation with SOX compliance. I am leading a couple of training
>>> classes next week and due to this concern, I will be covering this topic.
>>> How best to do that? Figure a half hour at most (including Q&A).
>>>
>>> What I have surmised is that part of SOX can be covered in the DoD. And
>>> part would be covered in the User Stories as Acceptance Criteria. I also
>>> posit that the PO accepting the story might me sufficient for the user
>>> acceptance tests, since the PO comes from the business.
>>>
>>>
>>> 1. Can someone point me to a few representative samples of these?
>>> 2. What else is there to know? Is there anything outside of stories
>>> and DoD that is part of how agile handles SOX?
>>>
>>>
>>> My goal is to get them to a) worry less because it’s handled and b) not
>>> to hamstring themselves into some overkill process and c) make sure they
>>> can survive or better, avoid an audit. (Indeed we have a project names
>>> Phoenix here :).
>>>
>>> Michael
>>>
>>>
>>
>>
>> --
>> Wouter Lagerweij | [email protected]
>> http://www.lagerweij.com | @wouterla <http://twitter.com/#!/wouterla>